1 MONGOLIA’S TOURISM SURGE: 1 MILLION VISITORS TARGETED & $1.6 BILLION REVENUE IN 2026 – WHAT AIRLINES LIKE AIR CHINA & MARRIOTT ARE DOING TO CASH IN! WWW.TRAVELANDTOURWORLD.COM PUBLISHED:2026/01/07      2 NEW FLIGHTS FROM MONGOLIA TO SINGAPORE, VIETNAM, CHINA, AND EUROPE IN 2026: HOW THESE ROUTES ARE REVOLUTIONIZING TRAVEL! WWW.TRAVELANDTOURWORLD.COM PUBLISHED:2026/01/07      3 ‘ULAANBAATAR TRAM’ TO CONNECT ZUNJIN AND SUKHBAATAR SQUARE IN 29 MINUTES WWW.MONTSAME.MN PUBLISHED:2026/01/07      4 ULAANBAATAR TO BUILD, UPGRADE 85.8 KM OF ROADS IN 2026 WWW.MONTSAME.MN PUBLISHED:2026/01/07      5 HOUSING PROJECTS TO ADVANCE, CONSTRUCTION SECTOR TO BE SUPPORTED IN 2026 WWW.MONTSAME.MN PUBLISHED:2026/01/07      6 OVER 20,000 LAND PLOTS TO BE CLEARED THIS YEAR WWW.MONTSAME.MN PUBLISHED:2026/01/07      7 MONGOLIA’S INFLUENZA SEASON NOW LONGER AND CASES HIGHER OVER THE PAST THREE YEARS WWW.ASIANEWS.NETWORK PUBLISHED:2026/01/07      8 COPPER PRICE HITS NEW RECORD OF $13,000 IN LONDON WWW.MINING.COM PUBLISHED:2026/01/06      9 MOST MINERAL AND METAL PRICES TO EDGE HIGHER IN 2026, FITCH FORECASTS WWW.MINING.COM PUBLISHED:2026/01/06      10 G.ZANDANSHATAR: MONGOLIA AIMS FOR 1 MILLION TOURISTS AND USD 1 BILLION IN TOURISM REVENUE WWW.GOGO.MN PUBLISHED:2026/01/06      ЗЭС, ЭРХ МЭДЭЛ, ЭРСДЭЛ: ДЭЛХИЙН ГЕОПОЛИТИКИЙН ШАТРЫН ӨРӨГ ДЭЭРХ МОНГОЛ УЛС WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/07     КАНАДЫН AIR TRANSAT КОМПАНИ ТОРОНТО-УЛААНБААТАР ЧИГЛЭЛД ШУУД НИСЛЭГ ҮЙЛДЭНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/07     М БАНК СИНГАПУРЫН ХӨРӨНГИЙН БИРЖИД АНХНЫ БОНДОО ГАРГАЛАА WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/07     2026 ОНД НИЙСЛЭЛИЙН ХЭМЖЭЭНД 85.8 КМ АВТО ЗАМЫГ ЗАСАЖ, ШИНЭЧИЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/07     ТУСГАЙ ЗАМЫН АВТОБУСНЫ АЖЛЫН ЗУРАГ БОЛОВСРУУЛАХ ГҮЙЦЭТГЭГЧИЙГ СОНГОН ШАЛГАРУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/07     E-MONGOLIA СИСТЕМ 12 ТӨРЛИЙН ЛАВЛАГААГ ТАВАН УЛСЫН ХЭЛЭЭР ОЛГОЖ ЭХЭЛЛЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/07     БЭТ Ж.БАТЗАНДАНГ ҮҮРЭГТ АЖЛААС НЬ ЧӨЛӨӨЛЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/07     ГАДААД ВАЛЮТЫН АЛБАН НӨӨЦ 7 ТЭРБУМ ДОЛЛАРТ ХҮРЧЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/06     ӨНГӨРӨГЧ ОНД 124 945 ГАДААД ИРГЭНД ВИЗ ОЛГОЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/06     ЭНЭ ОНД 20 МЯНГА ГАРУЙ НЭГЖ ТАЛБАРТ ГАЗАР ЧӨЛӨӨЛНӨ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/06    

Nickel +Chrome and Cobalt (Mongolia)

Looking to Discover and Develop large near surface  Nickel-Chrome-Cobalt project in Middle-South

Gobi Ultramafic belt

Tavan tolgoi terminal – Gashuun shukhait port (1)

Tavan tolgoi terminal– Hangi Mandal port (2)

Tavan tolgoi terminal – Sainshand – Zamiin uud port (3) railway transportation is available.

Water wells in Fault zone and Cretaceous depression.

High pressured water resource is available in Fault zone.

Distance between 20 кV power line’s and Main target is 11.7 km east.

Distance between 35 кV power line’s and Main target is 1.85 km east

The oxidized + intermediate enrichment ore are covered over an area of 270 x 150 m (150-400 x1500 m).

Sulfide ore is discovered about 250 х 1250 m (150-300 x 1500 m).

Eastern zone 

The size of the area with oxidized ore is 100 x 400 m (80-150 x 400 m).

The zones of the ore bodies are generally revealed dip vertically by deep geophysical survey.

The ore bodies in the central zone have been confirmed to be persistent by geophysical surveys at a depth of 217 m.

 

Demand of Nickel (Ni), Chrome (Cr), and Cobalt (Co) is assumed to be increased 6 times.

(in Bloomberg)

 

Contact: contact@mongolianbusinessdatabase.com 976 99066062