1 KAKAO BANK TARGETS MONGOLIA IN NEXT GLOBAL PUSH WWW.KOREAHERALD.COM PUBLISHED:2026/04/08      2 MONGOLIA INVITES BIDS FOR MAJOR STEEL COMPLEX PROJECT WWW.MONTSAME.MN PUBLISHED:2026/04/08      3 PM UCHRAL FREEZES 3,000 CIVIL SERVICE POSITIONS, MOVES TO CUT WORKLOAD WWW.MONTSAME.MN PUBLISHED:2026/04/08      4 THE CENTRAL BANK OF MONGOLIA SELLS GOLD AND SILVER BARS AS SOUVENIRS AND COLLECTIBLES WWW.OPEN.KG PUBLISHED:2026/04/08      5 GOVERNMENT CANCELS 2026 INSPECTION PLAN TO EASE PRESSURE ON BUSINESSES WWW.MONTSAME.MN PUBLISHED:2026/04/08      6 DRAFT LAW ON RECALLING MEMBERS OF PARLIAMENT BACKED FOR DISCUSSION WWW.MONTSAME.MN PUBLISHED:2026/04/08      7 TRAFFIC POLICE STEP UP ACTION AGAINST UNDERAGE SURRON RIDERS WWW.GOGO.MN PUBLISHED:2026/04/08      8 MONGOLIA ISSUES WILDFIRE WARNING WWW.XINHUANET.COM PUBLISHED:2026/04/08      9 THE NEW MINISTER PROMISES TO PROMPTLY PROVIDE FARMERS WITH PREFERENTIAL LOANS WWW.OPEN.KG PUBLISHED:2026/04/08      10 MONGOLIA'S NEW CABINET IS ASSEMBLED. NOW COMES THE HARD PART WWW.CAPITALMARKETS.MN PUBLISHED:2026/04/07      KAKAOBANK ҮЙЛ АЖИЛЛАГААНЫ ТЭЛЭЛТИЙНХЭЭ ГУРАВ ДАХЬ ГАДААД ЗАХ ЗЭЭЛЭЭР МОНГОЛ УЛСЫГ СОНГОЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/08     Г.ДАМДИННЯМ: 800 САЯ АМ.ДОЛЛАРЫН ӨРТӨГ БҮХИЙ ГАНГИЙН ҮЙЛДВЭРИЙН ТӨСЛИЙГ ЭХЛҮҮЛЖ БАЙНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/04/08     МОНГОЛ УЛС ИНТЕРНЭТИЙН ЭРХ ЧӨЛӨӨГӨӨР 42-Т ЖАГСЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/08     Л.ЭНХ-АМГАЛАН: МҮИС ГЭХ НЭР ХУУЛЬ БУС. ГЭВЧ НЭР ОДОО ХЭР НЬ ӨӨРЧЛӨГДӨӨГҮЙ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/08     “СЭЛБЭ 20 МИНУТЫН ХОТ” ТӨСӨЛД ДОТООДЫН ҮЙЛДВЭРЛЭГЧДИЙН ОРОЛЦООГ НЭМЭГДҮҮЛНЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/08     262 САЯ АМ.ДОЛЛАРЫН ӨРТӨГТЭЙ ТӨВ ЦЭВЭРЛЭХ БАЙГУУЛАМЖ 10-Р САРД АШИГЛАЛТАД ОРНО WWW.EGUUR.MN НИЙТЭЛСЭН:2026/04/08     ТУУЛЫН ХУРДНЫ ЗАМЫН ТӨСЛИЙГ ХУУЛЬД НИЙЦҮҮЛТЭЛ ТҮР ЗОГСООЛОО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/08     УИХ-ЫН ГИШҮҮНИЙГ ЭГҮҮЛЭН ТАТАХТАЙ ХОЛБООТОЙ ХУУЛИЙН ТӨСЛИЙГ ХЭЛЭЛЦЭХИЙГ ДЭМЖЛЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/04/08     ТАТВАРЫН ХУУЛЬД АЖ АХУЙН НЭГЖ, ИРГЭДДЭЭ БОЛОМЖ ОЛГОСОН НЭМЭЛТ ӨӨРЧЛӨЛТ ОРУУЛЖ, ЯАРАЛТАЙ ХЭЛЭЛЦҮҮЛЭХИЙГ ҮҮРЭГ БОЛГОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/04/08     17 САЯ ЕВРОГИЙН ЗЭЭЛ АВЧ ЭРЧИМ ХҮЧНИЙ САЛБАРТ ЗАРЦУУЛАХЫГ ДЭМЖЛЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/07    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Nickel +Chrome and Cobalt (Mongolia)

Looking to Discover and Develop large near surface  Nickel-Chrome-Cobalt project in Middle-South

Gobi Ultramafic belt

Tavan tolgoi terminal – Gashuun shukhait port (1)

Tavan tolgoi terminal– Hangi Mandal port (2)

Tavan tolgoi terminal – Sainshand – Zamiin uud port (3) railway transportation is available.

Water wells in Fault zone and Cretaceous depression.

High pressured water resource is available in Fault zone.

Distance between 20 кV power line’s and Main target is 11.7 km east.

Distance between 35 кV power line’s and Main target is 1.85 km east

The oxidized + intermediate enrichment ore are covered over an area of 270 x 150 m (150-400 x1500 m).

Sulfide ore is discovered about 250 х 1250 m (150-300 x 1500 m).

Eastern zone 

The size of the area with oxidized ore is 100 x 400 m (80-150 x 400 m).

The zones of the ore bodies are generally revealed dip vertically by deep geophysical survey.

The ore bodies in the central zone have been confirmed to be persistent by geophysical surveys at a depth of 217 m.

 

Demand of Nickel (Ni), Chrome (Cr), and Cobalt (Co) is assumed to be increased 6 times.

(in Bloomberg)

 

Contact: contact@mongolianbusinessdatabase.com 976 99066062