1 PROCUREMENT AND CONSTRUCTION OF PREMIUM NEW DISTRIBUTION CENTER (EOI ANNOUNCEMENT) WWW.MONTSAME.MN PUBLISHED:2025/10/10      2 SIGNING OF GRANT AGREEMENT WITH MONGOLIA:CONTRIBUTING TO STRENGTHENING THE FOUNDATION FOR DEVELOPING ENGINEERS THROUGH A JAPANESE-STYLE PRACTICAL TRAINING FACILITY AND EQUIPMENT WWW.JICA.GO.JP PUBLISHED:2025/10/10      3 PETRO MATAD SHARES SURGE AFTER MONGOLIA TESTS ‘EXCEEDED EXPECTATIONS’ WWW.UKINVESTORMAGAZINE.CO.UK PUBLISHED:2025/10/09      4 ULAANBAATAR TO SUPPLY 170,000 HOUSEHOLDS WITH SEMI-COKE BRIQUETTES WWW.MONTSAME.MN PUBLISHED:2025/10/09      5 100.9 KILOMETERS OF ROADS UPGRADED IN ULAANBAATAR THIS YEAR WWW.MONTSAME.MN PUBLISHED:2025/10/09      6 ADVISED TO MANAGE STRATEGIC MINERAL RESOURCES PRUDENTLY WWW.MONTSAME.MN PUBLISHED:2025/10/09      7 30 KILOMETERS OF RAINWATER DRAINAGE PIPELINES TO BE INSTALLED IN 2026 WWW.MONTSAME.MN PUBLISHED:2025/10/09      8 ARCHAEOLOGISTS USE INNOVATIVE TECHNOLOGIES IN SEARCH FOR GENGHIS KHAN'S TOMB WWW.BGNES.COM PUBLISHED:2025/10/09      9 MONGOLIA BUILDS AWARENESS OF UN WATER CONVENTION WITH A VIEW TO STRENGTHENING TRANSBOUNDARY WATER COOPERATION WWW.UNECE.ORG PUBLISHED:2025/10/09      10 CHINA-EUROPE FREIGHT TRAINS PASSING THROUGH CENTRAL CORRIDOR TOP 3,000, 39 DAYS AHEAD OF 2024 WWW.GLOBALTIMES.CN PUBLISHED:2025/10/09      ЕВРОПЫН ХОЛБОО БОЛОН МОНГОЛ УЛСЫН БИЗНЕС, ХӨРӨНГӨ ОРУУЛАЛТЫН ФОРУМ БОЛНО WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/10     ДҮҮЖИН ЗАМЫН ТЭЭВЭР ТӨСӨЛ 38 ХУВИЙН ГҮЙЦЭТГЭЛТЭЙ ҮРГЭЛЖИЛЖ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2025/10/10     МОНГОЛООС 20 САЯАР АВДАГ ШОНХОР ШУВУУ САУДЫН АРАБД 622 САЯ ТӨГРӨГӨӨР ЗАРАГДЛАА WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/09     АЗИЙН ХӨГЖЛИЙН БАНКНААС ЗЭЭЛ АВЧ 31 СУРГУУЛЬ, 9 ЦЭЦЭРЛЭГ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/09     Д.ЦОЛМОНГ ОЮУ ТОЛГОЙ ХХК-ИЙН ТУЗ-ИЙН ГИШҮҮНЭЭР ТОМИЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/09     Б.ЭНХБАЯРЫГ ХЗДХ-ИЙН САЙДААР ТОМИЛОХ ТАНИЛЦУУЛГЫГ ХОЙШЛУУЛЖЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2025/10/09     ХАГАС КОКСОН ШАХМАЛ ТҮЛШИЙГ ӨНӨӨДРӨӨС БОРЛУУЛЖ ЭХЭЛЛЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/09     МОНГОЛЫН ЭДИЙН ЗАСАГТ ТУЛГАРЧ БУЙ ЭРСДЭЛИЙГ ОЛОН УЛСЫН БАЙГУУЛЛАГУУД ИНГЭЖ ТОДОРХОЙЛОВ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/08     ЕРӨНХИЙЛӨГЧ У.ХҮРЭЛСҮХИЙН ЭНЭТХЭГТ ХИЙХ АЙЛЧЛАЛ НЬ СТРАТЕГИЙН ТҮНШЛЭЛИЙГ ДАХИН ТОДОРХОЙЛНО WWW.ITOIM.MN НИЙТЭЛСЭН:2025/10/08     "ОЮУ ТОЛГОЙ" ХХК-ИЙН ТУЗ-ИЙН ГИШҮҮНЭЭС Э.БАЯСГАЛАНГ ЧӨЛӨӨЛЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/10/08    

Good Quality HD712 Shank Adapters T45 Drill Rock

Price: 200

Product Despcription

Maxdrill shank adaptors ensure a quality drill string interface to the most exacting industry tolerances. Built to seamlessly interface with hydraulic and pneumatic drifters and top hammers, our shank adapters come in a full range of industry-standard thread configurations. Our precision grinding process ensures straightness, and our tools are fully carburized with an advanced heat treatment.

Different shank adapters are available, like Atlas Copco, Tamrock, Ingersoll Rand,etc. Also for the same drill machine, due to different applications, the shank adapters can be different length and different threads

T38 435mm drifting shank adapter for tunneling are used for transmitting power from the rock drill to the drill stems. Generally there are male threaded shank dapters and femal threaded shank adapters. Male shank adapters are more popular than female shank adapter. Male shank adapters are generally suited for drifting, tunneling and extension applications where high stresses are present. Female shank adapters are used when the drilling space is limited. Top quality of alloy steels, CNC machining and advanced heat threatment ensure our reliable quality,

Type Thread Length(mm) Dia(mm) Weight(mm) Product No.
HD712 T45 790 51 9.5 60W790-8-T45D5103