1 CENTRAL BANK INTRODUCES NEW RESERVE RULE FOR FOREIGN BORROWING WWW.MONTSAME.MN PUBLISHED:2026/05/27      2 CONSUMER LOAN DEFAULTS STABILIZE IN RECENT MONTHS WWW.MONTSAME.MN PUBLISHED:2026/05/27      3 GOVERNMENT APPROVES MAJOR RESTRUCTURING OF ERDENES MONGOL WWW.MONTSAME.MN PUBLISHED:2026/05/27      4 CAPITAL MARKETS MONGOLIA SUCCESSFULLY HOSTS INAUGURAL MONGOLIA INVESTMENT FORUM IN SHANGHAI WWW.CAPITALMARKETS.MN PUBLISHED:2026/05/27      5 NATIONAL GREEN LAB SHORTLISTS TOP PROJECTS FOR COP17 WWW.MONTSAME.MN PUBLISHED:2026/05/27      6 MONGOLIA INTRODUCES IDENTIFICATION SIGNS FOR PREGNANT WOMEN WWW.XINHUANET.COM PUBLISHED:2026/05/27      7 ROAD CONSTRUCTION FOR COP-17 TO BE COMPLETED BY JULY 1 WWW.GOGO.MN PUBLISHED:2026/05/27      8 B.PUREVDAGVA APPOINTED GOVERNOR OF THE CAPITAL CITY AND MAYOR OF ULAANBAATAR WWW.GOGO.MN PUBLISHED:2026/05/27      9 INTERIM TRADE AGREEMENT TO DIVERSIFY EXPORT STRUCTURE, MARKETS WWW.MONTSAME.MN PUBLISHED:2026/05/27      10 TOWARD A US-MONGOLIA CRITICAL MINERALS PARTNERSHIP WWW.NATIONALINTEREST.ORG PUBLISHED:2026/05/26      "РИО ТИНТО"-ТОЙ ХЭЛЭЛЦЭЭ ХИЙХТЭЙ ЗЭРЭГЦЭН Г.ДАМДИННЯМ ЗЭСИЙН АМНАТ-ИЙГ БУУРУУЛАХ ХУУЛЬ ЗҮТГҮҮЛЛЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/05/27     “ЭРДЭНЭТ ҮЙЛДВЭР” ТӨҮГ-Т АЖИЛЛАЖ БАЙХДАА ИХ ХЭМЖЭЭНИЙ ХАХУУЛЬ АВСАН ХЭРГИЙГ ШҮҮХЭЭР ШИЙДВЭРЛЭЖЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/05/27     "ЭРДЭНЭС ОЮУ ТОЛГОЙ" КОМПАНИЙГ Б.ТЭЛМҮҮН УДИРДАНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/05/27     Б.ДАВААДАЛАЙ: "ЭРДЭНЭС МОНГОЛ НЭГДЭЛ" НЭРЭЭ ӨӨРЧИЛЖ, ХӨРӨНГӨ УДИРДАХ ЧИГЛЭЛД ТӨВЛӨРНӨ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/05/27     УС, ДУЛААНЫ ТӨЛБӨРӨӨ ТӨЛДӨГГҮЙ ӨРХИЙН МЭДЭЭЛЛИЙГ ЗЭЭЛИЙН МЭДЭЭЛЛИЙН САНД БҮРТГЭНЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/05/27     ЗҮТГҮҮРИЙН ЦАХИЛГААН ХӨДӨЛГҮҮРИЙГ МОНГОЛДОО ЗАСДАГ БОЛЛОО WWW.GOGO.MN НИЙТЭЛСЭН:2026/05/27     БАНКНЫ САЛБАР ГАДААД ЗАХ ЗЭЭЛЭЭС УРТ ХУГАЦААТ ЭХ ҮҮСВЭР ТАТАХЫГ ДЭМЖИХ ШИЙДВЭР ГАРГАВ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/05/27     МАНАЙ УЛС АМИА ХОРЛОЛТЫН ТООГООР ДЭЛХИЙД ХОЁРТ ЭРЭМБЭЛЭГДЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/05/27     ЗӨВЛӨМЖ: НАС БАРСАН ИРГЭНИЙ 1072 ХУВЬЦААГ ӨВЛҮҮЛЖ, НОГДОЛ АШИГ АВАХ 5 АЛХАМ, БУСАД ЗААВАРЧИЛГАА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/05/27     БАНКНЫ САЛБАР 2.5 ИХ НАЯД ТӨГРӨГИЙН НОГООН ЗЭЭЛ ОЛГООД БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/05/27    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Sandstorm Q3 gold output jumps, second best in company history www.mining.com

Sandstorm Gold Ltd. (NYSE MKT: SAND, TSX: SSL) is pleased to report the attributable gold equivalent ounces sold during the third quarter of 2017 and recent updates from the Company's royalty properties.

Erdene Continues to Define New Zone at Bayan Khundii, Receives Positive Metallurgical Results

Erdene Resource Development Corp. ("Erdene") announced additional assay results from their ongoing 2017 drill program at the Bayan Khundii project in southwest Mongolia. A total of 19,386 metres have been drilled in 2017 and during the fourth quarter Erdene will be testing a series of geophysical and geochemical targets within the larger Bayan Khundii prospect area.

Results from drilling completed during the third quarter have continued to define a high-grade zone between the Midfield and Striker Zones. Hole BKD-194 is the latest in a series of holes confirming the continuity between these two high-grade zones. Three holes were also drilled to test potential continuity of gold mineralization west of the Midfield Zone (BKD-183,189 and 190) and a single hole (BKD-198) was drilled 130 metres west of the Striker Zone to test the down-dip potential of previously completed hole BKD-32 which returned a broad zone of low-grade mineralization during 2016 drilling. This hole confirmed higher grades at depth. Drill highlights include:

BKD-188: 120.0 metres of 1.1 g/t gold from 110.0 metres including 3.0 metres of 33.1 g/t gold from 176.0 metres;
BKD-194: 128.0 metres of 1.1 g/t gold from 49.0 metres including 22.0 metres of 3.3 g/t gold from 115.0 metres;
BKD-196: 22.0 metres of 2.4 g/t gold from 112.0 metres including 1.0 metre of 43.1 g/t gold from 118.0 metres;
BKD 197: 6.0 metres of 2.7 g/t gold from 130.0 metres;
BKD-198: 25.0 metres of 1.4 g/t gold from 144.0 metres including 3.0 metres of 7.8 g/t gold from 145.0 metres; and
BKD-30ext: 58.0 metres of 1.2 g/t gold from 59.0 metres including 16.0 metres of 2.8 g/t gold from 87.0 metres.
The results from Phase I metallurgical testing at Bayan Khundii has come back positive with two master composites indicating that gold from the project is free milling and amenable to conventional processing techniques.

Sandstorm has a 2.0% NSR royalty on Erdene's Bayan Khundii and Altan Narprojects.

Reported intervals are not true width. For more information and for complete drill results visit Erdene's website at www.erdene.com and see the press releases dated September 14, 2017 and September 12, 2017.



Published Date:2017-10-04