1 WORLD BANK PROJECTS 5% ECONOMIC GROWTH FOR MONGOLIA IN 2026 WWW.MONTSAME.MN PUBLISHED:2026/04/12      2 MONGOLIA TO IMPLEMENT PROJECT TO REDUCE HAZARDOUS CHEMICAL USE WWW.MONTSAME.MN PUBLISHED:2026/04/12      3 PM UCHRAL HOLDS TALKS WITH RUSSIAN AMBASSADOR ON FUEL SUPPLIES WWW.MONTSAME.MN PUBLISHED:2026/04/12      4 WORLD CIRCUS IN MONGOLIA 2026 SHOW TO OPEN SOON WWW.OPEN.KG PUBLISHED:2026/04/12      5 WORLD BANK: MONGOLIA’S ECONOMY STAYS RESILIENT BUT FACES RISING UNCERTAINTY WWW.RELIEFWEB.INT/ PUBLISHED:2026/04/10      6 CAN UCHRAL HOLD ON? BEYOND MONGOLIA’S LEADERSHIP SHAKE-UP WWW.THEDIPLOMAT.COM PUBLISHED:2026/04/10      7 $6 MILLION DIGITAL PROJECT LAUNCHED FOR CHINGGIS KHAAN MUSEUM WWW.ZSM.MN PUBLISHED:2026/04/10      8 STEEL PLANT WORTH $800 MILLION TO BE BUILT IN MONGOLIA WWW.AKIPRESS.COM PUBLISHED:2026/04/10      9 TMK GAS SURGE CLEARS PATH TO PRODUCTION AT MONGOLIAN PROJECT WWW.THEWEST.COM.AU PUBLISHED:2026/04/10      10 5 CHILDREN DIE FROM MENINGOCOCCAL DISEASE AND MEASLES WWW.UBPOST.MN PUBLISHED:2026/04/10      БАРИЛГЫН КОМПАНИУД ТӨСЛИЙНХӨӨ 30 ХҮРТЭЛХ ХУВИЙГ ӨӨРИЙН ХӨРӨНГӨӨР ГҮЙЦЭТГЭЖ БАЙЖ ЗАХИАЛГА АВДАГ БОЛНО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/12     МОНГОЛ УЛСАД АМЬДАРЧ БУЙ 5153 ИРГЭНИЙ ОРШИН СУУХ ЗӨВШӨӨРЛИЙГ ХАСЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/12     ГАНГИЙН ҮЙЛДВЭРИЙГ ДАРХАН-УУЛ АЙМАГТ БАРИНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/12     10 САЯ ПАУНДЫН ДЭМЖЛЭГИЙГ ҮРГЭЛЖЛҮҮЛЭХ ХҮСЭЛТ ТАВИВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/12     ҮСХ: ГАДААД ХУДАЛДААНЫ НӨХЦӨЛИЙН ИНДЕКС ӨМНӨХ ОНООС 13 ХУВИАР ӨСӨВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/10     ЭРЧИМ ХҮЧНИЙ ИНЖЕНЕР Д.ТЭНГИС: ₮3.5 ИХ НАЯДААР НАЙМАН ЖИЛИЙН ХУГАЦААНД УЛААНБААТАРЫГ УТААГҮЙ БОЛГОХ БОЛОМЖТОЙ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/04/10     АРХЕОЛОГИ, УГСААТНЫ МУЗЕЙ 80 ХУВИЙН ГҮЙЦЭТГЭЛТЭЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/10     3–5 МЯНГАН ТОНН ҮРИЙН ТӨМС ЗЭЭЛИЙН НӨХЦӨЛӨӨР НИЙЛҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/10     ДЭЛХИЙН БАНК: 2026 ОНД МОНГОЛЫН ЭДИЙН ЗАСАГ 5 ХУВЬ ӨСӨХ ХҮЛЭЭЛТТЭЙ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/09     “PLAYTIME” НААДМЫН ЭХНИЙ АРГА ХЭМЖЭЭ СҮХБААТАРЫН ТАЛБАЙД БОЛНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/09    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Nalaikh district challenged by instability of thermal power plant www.montsame.mn

Ulaanbaatar /MONTSAME/ The most pressing issues in Nalaikh district are lack of heat supply and apartment re-planning, according to its Governor Ch.Radnaabazar, who reported these issues during a meeting of the managerial staff of the capital city administration on May 7.

“Heating is a number one issue in the district with the Nalaikh Thermal Power Plant overworking its capacity. Since the demand increases every year, we are developing a project to expand the power plant,” he said.

As for apartment re-planning, there are 101 buildings and facilities built with engineering design and 32 two-storey buildings that were built between 1956-1957. “Dwelling in these buildings was prohibited by the General Agency for Specialized Inspection in 2014. This is a worrisome matter that the residents still live in these buildings today,” the Governor said.

Nalaikh district has a population of 37 thousand, majority of which are youths. “If we ensure the economic independence of Nalaikh district and establish an industrial and technological park, we could create 1,500 new jobs, increase the production of construction material twice on the national level and significantly benefit,” he highlighted.
Kh.Aminaa



Published Date:2018-05-08