1 WORLD BANK PROJECTS 5% ECONOMIC GROWTH FOR MONGOLIA IN 2026 WWW.MONTSAME.MN PUBLISHED:2026/04/12      2 MONGOLIA TO IMPLEMENT PROJECT TO REDUCE HAZARDOUS CHEMICAL USE WWW.MONTSAME.MN PUBLISHED:2026/04/12      3 PM UCHRAL HOLDS TALKS WITH RUSSIAN AMBASSADOR ON FUEL SUPPLIES WWW.MONTSAME.MN PUBLISHED:2026/04/12      4 WORLD CIRCUS IN MONGOLIA 2026 SHOW TO OPEN SOON WWW.OPEN.KG PUBLISHED:2026/04/12      5 WORLD BANK: MONGOLIA’S ECONOMY STAYS RESILIENT BUT FACES RISING UNCERTAINTY WWW.RELIEFWEB.INT/ PUBLISHED:2026/04/10      6 CAN UCHRAL HOLD ON? BEYOND MONGOLIA’S LEADERSHIP SHAKE-UP WWW.THEDIPLOMAT.COM PUBLISHED:2026/04/10      7 $6 MILLION DIGITAL PROJECT LAUNCHED FOR CHINGGIS KHAAN MUSEUM WWW.ZSM.MN PUBLISHED:2026/04/10      8 STEEL PLANT WORTH $800 MILLION TO BE BUILT IN MONGOLIA WWW.AKIPRESS.COM PUBLISHED:2026/04/10      9 TMK GAS SURGE CLEARS PATH TO PRODUCTION AT MONGOLIAN PROJECT WWW.THEWEST.COM.AU PUBLISHED:2026/04/10      10 5 CHILDREN DIE FROM MENINGOCOCCAL DISEASE AND MEASLES WWW.UBPOST.MN PUBLISHED:2026/04/10      БАРИЛГЫН КОМПАНИУД ТӨСЛИЙНХӨӨ 30 ХҮРТЭЛХ ХУВИЙГ ӨӨРИЙН ХӨРӨНГӨӨР ГҮЙЦЭТГЭЖ БАЙЖ ЗАХИАЛГА АВДАГ БОЛНО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/12     МОНГОЛ УЛСАД АМЬДАРЧ БУЙ 5153 ИРГЭНИЙ ОРШИН СУУХ ЗӨВШӨӨРЛИЙГ ХАСЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/12     ГАНГИЙН ҮЙЛДВЭРИЙГ ДАРХАН-УУЛ АЙМАГТ БАРИНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/12     10 САЯ ПАУНДЫН ДЭМЖЛЭГИЙГ ҮРГЭЛЖЛҮҮЛЭХ ХҮСЭЛТ ТАВИВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/12     ҮСХ: ГАДААД ХУДАЛДААНЫ НӨХЦӨЛИЙН ИНДЕКС ӨМНӨХ ОНООС 13 ХУВИАР ӨСӨВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/10     ЭРЧИМ ХҮЧНИЙ ИНЖЕНЕР Д.ТЭНГИС: ₮3.5 ИХ НАЯДААР НАЙМАН ЖИЛИЙН ХУГАЦААНД УЛААНБААТАРЫГ УТААГҮЙ БОЛГОХ БОЛОМЖТОЙ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/04/10     АРХЕОЛОГИ, УГСААТНЫ МУЗЕЙ 80 ХУВИЙН ГҮЙЦЭТГЭЛТЭЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/10     3–5 МЯНГАН ТОНН ҮРИЙН ТӨМС ЗЭЭЛИЙН НӨХЦӨЛӨӨР НИЙЛҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/10     ДЭЛХИЙН БАНК: 2026 ОНД МОНГОЛЫН ЭДИЙН ЗАСАГ 5 ХУВЬ ӨСӨХ ХҮЛЭЭЛТТЭЙ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/09     “PLAYTIME” НААДМЫН ЭХНИЙ АРГА ХЭМЖЭЭ СҮХБААТАРЫН ТАЛБАЙД БОЛНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/09    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Aggreko ready to power Mongolia www.aggreko.com

According to the Sustainable Energy Sector Development Strategy, approved by the Government in 2002, Mongolia set the following aims in the energy efficiency sector: sustainable development of the energy sector and power access and affordability of energy supply even in the most remote regions of the country.
“For our company, Mongolia is one of the priority regions,” - says Dominique Rachez, Managing Director for Central Asia of Aggreko Eurasia LLC. – The Mongolian economics is one of the most promising in the world. According to the forecasts of the World Bank experts, for the next few years Mongolia will be showing the economic growth by an average of 13% per year, these figures are almost double the growth rate in China. For sure the economic growth will be accompanied by rapidly increasing power demand. We provide solutions that allow industries, large cities, small communities to optimize the cost of power production where is no access to grid or connection is being delayed, in a location with limited or no access to permanent power, when businesses require cooling or heating to run their production smoothly and efficiently. 
In recent years, Mongolian Government has been paying great attention to the development of renewable energy sector. The territory, low population density and renewable energy sources - all of these facts create a great potential for this sector. In such rapidly changing conditions, Aggreko Eurasia LLC keeps up to date, looking to the future, the company is now able to offer customers scalable power solutions based on a number of technologies, including: renewable energy sources as sources of power supply, hybrid technologies, such as mobile modular solar panels, battery storage and a fleet of generators as they run on eco-friendly gas fuel, natural gas, heavy fuel and hybrid options.
The business model of Aggreko Eurasia LLC is rental that means there is no CAPEX required from the customer’s side and power increase or decrease is very flexible due to the modular construction of Aggreko’s equipment. The generators are designed and produced in Scotland to the highest European standards, developed and built for rental-specific applications in the toughest environments on earth, manufactured in Aggreko’s ISO-accredited facility ISO 0900:2008 and is equipped with remote monitoring to aid in performance and reliability.
Aggreko Eurasia LLC operates as a subsidiary of Aggreko plc at the territory of Eurasia from 2008. The company provides temporary power, temperature control, and compressed air systems on rent. The company provides project design planning, installation, commissioning, process enhancement and operating services, and on-site service and maintenance support services. It serves manufacturing, mining, oil and gas, agricultural, construction and major event industries. The total capacity of provided power exceeds 700 MVA at the territory of Eurasia in 2017.
Among successfully operated and performed projects of Aggreko Eurasia LLC are power supply for Rosneft, Gazpromneft, Lukoil, Slavneft, EVRAZ Group, Antipinsky Oil Refinery, Heidelberg Cement, Pilkington Glass, BP Exploration Limited. 
“To learn more about Aggreko products and services please visit their website www.aggreko.com or contact them at Mongolia@aggreko.com or reach us via phone numbers +976 8059-9852 and +7 916 599 85 27”



Published Date:2018-11-28