1 MONGOLIA MOVES TO NEXT STAGE OF COPPER SMELTER SELECTION PROCESS WWW.MONTSAME.MN PUBLISHED:2026/02/26      2 INVESTMENT OPPORTUNITY IN MONGOLIAN MINING INTRODUCED IN LONDON WWW.MONTSAME.MN PUBLISHED:2026/02/26      3 MONGOLIA SEEKS LONDON STOCK EXCHANGE LISTINGS FOR MINING COMPANIES WWW.MONTSAME.MN PUBLISHED:2026/02/26      4 TMK ENERGY SETS NEW GAS OUTPUT RECORD AT MONGOLIAN CSG PILOT WWW.TIPRANKS.COM PUBLISHED:2026/02/26      5 WILL MONGOLIA BAN SOCIAL NETWORKS FOR CHILDREN, AS AUSTRALIA AND FRANCE HAVE DONE? WWW.OPEN.KG PUBLISHED:2026/02/26      6 FOREIGN TRADE TURNOVER REACHES USD 2.6 BILLION WWW.MONTSAME.MN PUBLISHED:2026/02/25      7 MONGOLIA REVOKES PERMITS OF SIX FOREIGN NGOS WWW.MONTSAME.MN PUBLISHED:2026/02/25      8 MINING DRIVES MONGOLIA’S ECONOMY AS REFORM MOMENTUM BUILDS WWW.EASTASIAFORUM.ORG PUBLISHED:2026/02/25      9 P.NARANBAYAR ANNOUNCES PLAN TO DRAFT LAW TO RESTRICT CHILDREN’S USE OF SOCIAL NETWORKS WWW.GOGO.MN PUBLISHED:2026/02/25      10 “EAGLE FESTIVAL-2026” TO BE HELD ON MARCH 7-8 WWW.GOGO.MN PUBLISHED:2026/02/24      ГАДААДЫН 95 ИРГЭНИЙГ УЛСЫН ХИЛЭЭР ОРУУЛАЛГҮЙ БУЦААЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/26     ЗЭСИЙН БАЯЖМАЛ ХАЙЛУУЛАХ, БОЛОВСРУУЛАХ ҮЙЛДВЭРИЙН ХӨРӨНГӨ ОРУУЛАГЧИЙГ ИРЭХ ТАВДУГААР САРД ТОДРУУЛНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/26     УЛААНБААТАР-ЛҮНГИЙН ЗАМЫГ ЗУРГААН ЭГНЭЭ БОЛГОНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/26     ЖАЙКА БОЛОН МТҮП МЭДЭЭЛЭЛ ТЕХНОЛОГИЙН САЛБАРЫГ ХӨГЖҮҮЛЭХ ТӨСЛИЙГ ХЭРЭГЖҮҮЛЖ ЭХЭЛЛЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/26     ЕРӨНХИЙ САЙДЫН АХЛАХ ЗӨВЛӨХ БӨГӨӨД АЖЛЫН АЛБАНЫ ДАРГААР Ж.САНДАГСҮРЭНГ ТОМИЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/26     БАРАА БҮТЭЭГДЭХҮҮНИЙ ҮНЭ САРЫН ХУГАЦААНД 2.7 ХУВИАР ӨСЧЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/26     НИЙСЛЭЛ ЗАРДЛАА ТЭЛЖ, ТРАМВАЙН ТӨСӨЛД 350 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/25     САНГИЙТ КАУР ДЕО: МАЛАЙЗЫН ТӨР БУРУУТАЙ ГЭДГИЙГ ШИЙДҮҮЛЭХ ЭЦСИЙН БОЛОМЖ УЧРААС МОНГОЛЫН ТӨР ХАМТРАН АЖИЛЛАХЫГ ХҮСЭЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     НИЙСЛЭЛИЙН ТӨСӨВ: COP17 ХУРАЛД 70 ТЭРБУМ ЗАРЦУУЛЖ, 200 ТЭРБУМЫН БОНД БОСГОЖ V ЦАХИЛГААН СТАНЦ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     ХӨРСНИЙ УС, ҮЕРИЙН ХАМГААЛАЛТЫН ТӨСЛИЙН ТЭЗҮ-ИЙГ БОЛОВСРУУЛАХ АЖИЛ 90 ХУВЬТАЙ ХЭРЭГЖИЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Power for every stage of the mine lifecycle www.aggreko.com

Aggreko has supplied CITIC Pacific Mining with critical load-testing capacity along with a highly flexible, supplementary power package during the construction of the Sino Iron project, located at Cape Preston, 100 km south west of Karratha, Western Australia. The project is the largest magnetite mining and processing operation under construction in Australia. Aggreko supplied 12 MVA of loadbank capacity to test the power generation capability of the on-site gas-fired power plant. Once fully commissioned, the 450 MW power plant will provide power to the entire operations at the mine: including the processing plant, the specially built port and the living quarters of the mine’s employees.

Loadbanks are used during commissioning to test the precise power-generating capacity of a power plant before it goes into operation. In addition to load-testing, Aggreko supplied 2.5 MW of power that was used at different stages of the project. This included 1,600 kVA for the commissioning of the processing plant and 350 kVA to power the intake pump of the project’s desalination plant. A further 13 generators were utilised for the commissioning of the dewatering plant.
”Aggreko’s contribution to the Sino Iron project highlights our ability to deliver multi-faceted, fully customised and highly flexible power solutions to our customers,” commented Asterios Satrazemis, Managing Director, Aggreko Australia-Pacific. “Our ability to cope with the complexity and size of the project, along with the constantly evolving demands placed on our equipment, is a great endorsement of both our people and our fleet.” Once fully commissioned, the mine’s own 450 MW power plant would be used to provide power to everything from the mine’s very own port to the many processing facilities. Testing the load on the plant was critical, and our 14 load banks were up to the task.

Our back-up power helped CITIC Pacific tick all those other construction jobs off their list. With our help, they moved closer to the final commissioning of this massive magnetite ore mine.

To learn more about our products and services you may at our site www.aggreko.com or please contact us at Mongolia@aggreko.com or Begench.Turayev@aggreko.com for more information