1 CHINA’S MONGOLIAN COAL IMPORTS UP 20% IN OCT, RUSSIAN IMPORTS SLIP 18% WWW.BRECORDER.COM  PUBLISHED:2025/11/21      2 S.KOREA-MONGOLIA JOINT COMMITTEE MEETING REAFFIRMS MINERAL COOPERATION WWW.KOREAPOST.COM PUBLISHED:2025/11/21      3 TEAM MONGOLIA FROM PHYSICAL ASIA: WHERE ARE THEY NOW? WWW.MOVIEDELIC.COM PUBLISHED:2025/11/21      4 N.UCHRAL: I’LL BE LENIENT WITH THE RIGHT, STRICT WITH THE WRONG WWW.GOGO.MN PUBLISHED:2025/11/20      5 MONGOLIAN BANKING SECTOR'S NET FOREIGN ASSETS DECLINE 16.1 PCT IN OCTOBER WWW.XINHUANET.COM PUBLISHED:2025/11/20      6 ON THE TALKS OF SECRETARY-GENERAL WITH THE MINISTER OF FOREIGN AFFAIRS OF MONGOLIA WWW.ENG.SECTSCO.ORG PUBLISHED:2025/11/20      7 MONGOLIA UNIFIES TO COMBAT NEW THREATS TO SNOW LEOPARDS WWW.SNOWLEOPARD.ORG PUBLISHED:2025/11/20      8 AMERICAN-CANADIAN BILLIONAIRE OPENS $2-BILLION PLATINUM MINE IN SOUTH AFRICA WWW.AFRICA.BUSINESSINSIDER.COM PUBLISHED:2025/11/20      9 EDUCATION INFRASTRUCTURE: 12 SCHOOLS, 24 KINDERGARTENS SET FOR 2025 LAUNCH WWW.MONTSAME.MN PUBLISHED:2025/11/20      10 MONGOLIA JAPAN HOSPITAL INTRODUCES SELECTIVE LASER TRABECULOPLASTY SYSTEM WWW.AKIPRESS.COM PUBLISHED:2025/11/20      Н.УЧРАЛ: ХУУЛЬ ТОТООХ ДЭЭД БАЙГУУЛЛАГААС ХУЛГАЙН СЭЖИГТНҮҮД БИШ ХУУЛЬ ТӨРЖ БАЙХ ЁСТОЙ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/21     ТЭРБУМ МОД САНГИЙН ТӨСЛИЙН СОНГОН ШАЛГАРУУЛАЛТ ЗАРЛАГДЛАА WWW.BILLIONTREE.MN НИЙТЭЛСЭН:2025/11/20     ОЙЖУУЛАЛТАД ХАМГИЙН ИХ ХӨРӨНГӨ ОРУУЛАЛТ ХИЙЖ БАЙГАА ХУВИЙН ХЭВШЛИЙН САНГААР ТЭРБУМ МОД САНГ НЭРЛЭЛЭЭ WWW.BILLIONTREE.MN НИЙТЭЛСЭН:2025/11/20     МОНГОЛД ГАДНЫ БАНК НЭЭХ НЬ ХЭРЭГЛЭГЧДЭД ӨГӨӨЖТЭЙ Ч ДОТООДЫН БАНК САНХҮҮГИЙН САЛБАРТ ЭРСДЭЛТЭЙ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/11/20     ӨНГӨРСӨН САРД 11 УЛСЫН 240 ИРГЭНИЙГ АЛБАДАН ГАРГАЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/11/20     Х.НЯМБААТАР: ГАНДАН ОРЧМЫГ НОГООН БАЙГУУЛАМЖ БҮХИЙ ЖИШИГ ГУДАМЖ БОЛГОН ТОХИЖУУЛНА WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/20     ОЮУ ТОЛГОЙ ТӨСЛИЙН ХУВЬ НИЙЛҮҮЛЭГЧДИЙН ЗЭЭЛИЙН ХҮҮГ БУУРУУЛАХ ХЭЛЭЛЦЭЭ ҮРГЭЛЖИЛЖ БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/11/20     УИХ-ЫН ДАРГААР Н.УЧРАЛ СОНГОГДЛОО WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/20     "ЧИНГИС ХААН" ОДОН ХҮРТЭЖ БУЙ С.НАРАНГЭРЭЛ ГЭЖ ХЭН БЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2025/11/20     ОХУ-ЫН БАНК САЛБАРАА МОНГОЛД НЭЭХ ҮҮ? WWW.NEWS.MN НИЙТЭЛСЭН:2025/11/20    

Power for every stage of the mine lifecycle www.aggreko.com

Aggreko has supplied CITIC Pacific Mining with critical load-testing capacity along with a highly flexible, supplementary power package during the construction of the Sino Iron project, located at Cape Preston, 100 km south west of Karratha, Western Australia. The project is the largest magnetite mining and processing operation under construction in Australia. Aggreko supplied 12 MVA of loadbank capacity to test the power generation capability of the on-site gas-fired power plant. Once fully commissioned, the 450 MW power plant will provide power to the entire operations at the mine: including the processing plant, the specially built port and the living quarters of the mine’s employees.

Loadbanks are used during commissioning to test the precise power-generating capacity of a power plant before it goes into operation. In addition to load-testing, Aggreko supplied 2.5 MW of power that was used at different stages of the project. This included 1,600 kVA for the commissioning of the processing plant and 350 kVA to power the intake pump of the project’s desalination plant. A further 13 generators were utilised for the commissioning of the dewatering plant.
”Aggreko’s contribution to the Sino Iron project highlights our ability to deliver multi-faceted, fully customised and highly flexible power solutions to our customers,” commented Asterios Satrazemis, Managing Director, Aggreko Australia-Pacific. “Our ability to cope with the complexity and size of the project, along with the constantly evolving demands placed on our equipment, is a great endorsement of both our people and our fleet.” Once fully commissioned, the mine’s own 450 MW power plant would be used to provide power to everything from the mine’s very own port to the many processing facilities. Testing the load on the plant was critical, and our 14 load banks were up to the task.

Our back-up power helped CITIC Pacific tick all those other construction jobs off their list. With our help, they moved closer to the final commissioning of this massive magnetite ore mine.

To learn more about our products and services you may at our site www.aggreko.com or please contact us at Mongolia@aggreko.com or Begench.Turayev@aggreko.com for more information



Published Date:2018-12-13