1 14TH MBD MISSION FOR MBCC'S "DOING BUSINESS WITH MONGOLIA SEMINAR & CHRISTMAS RECEPTION" AND BUSINESS PROGRAM DEC 08- 14. 2025 LONDON, UK WWW.MONGOLIANBUSINESSDATABASE.COM PUBLISHED:2025/09/16      2 IMF WRAPS UP 2025 ARTICLE IV TALKS WITH MONGOLIA WWW.IMF.ORG PUBLISHED:2025/09/16      3 POSCO INTERNATIONAL TO LAUNCH WASTEWATER HEAT DISTRICT HEATING PROJECT IN MONGOLIA WWW.CM.ASIAE.CO.KR  PUBLISHED:2025/09/16      4 MONGOLIA'S EXTERNAL DEBT UP 12.7 PCT IN Q2 2025 WWW.NEWS.AZ PUBLISHED:2025/09/16      5 2025 AUTUMN SESSION OF THE STATE GREAT KHURAL COMMENCES WITH STRUCTURAL REFORMS WWW.MONTSAME.MN PUBLISHED:2025/09/16      6 MONGOLIA SURPASSES 617,000 TOURIST ARRIVALS BY MID-SEPTEMBER 2025 WWW.MONTSAME.MN PUBLISHED:2025/09/16      7 ODD-EVEN TRAFFIC RESTRICTION CONCLUDES WWW.UBPOST.MN PUBLISHED:2025/09/15      8 MMC ANNOUNCES FIRST GOLD POUR COMPLETED AT THE BAYAN KHUNDII MINE IN MONGOLIA WWW.SG.FINANCE.YAHOO.COM  PUBLISHED:2025/09/15      9 MKE LAUNCHES CARTRIDGE PRODUCTION LINE IN MONGOLIA WWW.RAILLYNEWS.COM  PUBLISHED:2025/09/15      10 MONGOLIA’S LARGEST MINING EVENT HIGHLIGHTS INVESTMENT AND RESPONSIBLE MINING WWW.MONTSAME.MN PUBLISHED:2025/09/14      14 ДЭХЬ УДААГИЙН MBCCI’S “ DOING BUSINESS WITH MONGOLIA SEMINAR & CHRISTMAS RECEPTION” B2B NETWORKING БОЛОН БИЗНЕС ХӨТӨЛБӨР 2025 ОНЫ 12 САРЫН 08 -13 ЛОНДОН ХОТ, ИХ БРИТАНИ WWW.MONGOLIANBUSINESSDATABASE.COM НИЙТЭЛСЭН:2025/09/16     ЭДИЙН ЗАСГИЙН ТӨРӨЛЖИЛТИЙН ИНДЕКСЭЭР МОНГОЛ УЛС 145 ОРНООС 139-Д БИЧИГДЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2025/09/16     ӨНӨӨДӨР: “СЭЛБЭ 20 МИНУТЫН ХОТ”-ЫН ДАРААГИЙН ЭЭЛЖИЙН ОРОН СУУЦНЫ ТӨСЛИЙН БҮТЭЭН БАЙГУУЛАЛТЫГ ЭХЛҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/09/16     ШЭНЬ МИНЬЖУАНЬ: БНХАУ МОНГОЛ УЛСЫГ ШХАБ-ЫН ГЭР БҮЛД НЭГДЭЖ, ХАМТЫН АЖИЛЛАГААГАА ӨРГӨЖҮҮЛЭХИЙГ УРЬСАН WWW.ITOIM.MN НИЙТЭЛСЭН:2025/09/15     Г.ЗАНДАШАТАР: ТӨРИЙН ДАНХАР БҮТЦИЙГ ХУМИХ АЖИЛ ИРЭХ ОНД Ч ҮРГЭЛЖИЛНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/09/15     Ц.ТУВААН: НҮҮРСНИЙ ҮНЭ 3 САР ТУТАМ ШИНЭЧЛЭГДЭНЭ. ГЭРЭЭНД ЯМАР Ч НУУЦ БАЙХГҮЙ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/09/15     ХАНЫН МАТЕРИАЛД 1800 АЙЛЫН ОРОН СУУЦ БАРИХ ТӨСЛИЙН ГҮЙЦЭТГЭГЧ ШАЛГАРЛАА WWW.ITOIM.MN НИЙТЭЛСЭН:2025/09/15     "ТАТВАРЫН ХЭТ ӨНДӨР ТООЦОО БИЗНЕС ЭРХЛЭГЧДИЙГ ХААЛГАА БАРИХАД ХҮРГЭНЭ" WWW.NEWS.MN НИЙТЭЛСЭН:2025/09/15     ГАДААД ХУДАЛДААНЫ НӨХЦӨЛИЙН ИНДЕКС ӨМНӨХ ОНООС 4.1 ХУВИАР БУУРЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/09/15     ЭХНИЙ НАЙМАН САРЫН БАЙДЛААР 600 МЯНГАН ЖУУЛЧИН ИРЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/09/15    

Xanadu Mines receives more evidence of potential shallow oxide gold resource in Mongolia www.proactiveinvestors.com.au

Xanadu Mines Ltd (ASX:XAM) (TSE:XAM) has received broad high-grade results from the Golden Eagle oxide gold target at its flagship Kharmagtai project in southern Mongolia.

These results from nine shallow drill holes are encouraging and indicate the potential for a near-surface oxide resource.

The potential for alluvial gold above Golden Eagle is also being assessed with promising results to date.

“Largest zone of oxide gold”
Xanadu’s chief executive officer Dr Andrew Stewart said, “We are very pleased by the first drill results from the oxide zone at Golden Eagle.

“This represents the largest zone of oxide gold at Kharmagtai and this initial drill program is designed to expand the system and confirm continuity of oxide gold mineralisation.”

One hole returned 30 metres at 1.34 g/t from 37 metres, including 8 metres at 3.34 g/t from 38 metres and within this was 6 metres at 3.94 g/t from 40 metres.

Another hole returned 38.4 metres at 1.25 g/t from 34 metres, including 18 metres at 2.12 g/t from 35 metres and within this was 10 metres at 3.02 g/t from 39 metres.

Aims of program
The nine-hole program was initiated at Golden Eagle aimed at expanding the gold-rich core and confirming continuity of oxide gold mineralisation.

Another aim was to test the paleo-surface for potential alluvial enrichment above the oxide zone.

In systems where gold mineralisation outcrops at a paleo-surface it is common to encounter extremely high-grade zones of alluvial gold in paleochannels at the paleo-surface.

Other results were:

26 metres at 0.33 g/t from 41 metres, including 10 metres at 0.41 g/t from 41 metres;
9 metres at 1.19 g/t from 45 metres, including 3 metres at 2.48 g/t from 47 metres;
25.8 metres at 0.65 g/t from 35.2 metres;
23 metres at 0.5 g/t from 40 metres, including 12.1 metres at 0.64 g/t from 40 metres;
24 metres at 0.76 g/t from 36 metres, including 14 metres at 0.87 g/t from 36 metres; and
27.1 metres at 0.73 g/t from 37.9 metres, including 8 metres at 1.09 g/t Au from 39 metres.

Encouraging metallurgy
Preliminary metallurgical test work results provide a very good indication of the viability of a simple and efficient gold recovery process at Golden Eagle.

Stewart said, “Existing metallurgy from Golden Eagle is extremely encouraging and this zone of mineralisation has returned recoveries of up to 92.56%.”

Xanadu’s objective is to develop Mongolia’s next large-scale open-pit copper and gold deposit.

The CEO said, “We are encouraged by what we see at Stockwork Hill, particularly the grade and potential scale and strike extent of the oxide system.

“The new results demonstrate clear progress and, given Kharmagtai sits on a granted mining lease with a registered water resource and an established power supply nearby, we have the ability to move quickly on an oxide gold project.

“Our current strategy of seeking high-return options via an oxide gold project is focused on providing the capital needed to advance the larger scale copper and gold project.”



Published Date:2019-09-25