1 GOVERNMENT ORDERS UNINTERRUPTED GOAL TRANSPORTATION THROUGH GASHUUNSUKHAIT, KHANGI BORDER CROSSINGS WWW.MONTSAME.MN PUBLISHED:2026/02/26      2 CONCESSIONAL LOAN AGREEMENT SIGNED UNDER ‘WHITE GOLD’ NATIONAL MOVEMENT WWW.MONTSAME.MN PUBLISHED:2026/02/26      3 MONGOLIA MOVES TO NEXT STAGE OF COPPER SMELTER SELECTION PROCESS WWW.MONTSAME.MN PUBLISHED:2026/02/26      4 INVESTMENT OPPORTUNITY IN MONGOLIAN MINING INTRODUCED IN LONDON WWW.MONTSAME.MN PUBLISHED:2026/02/26      5 MONGOLIA SEEKS LONDON STOCK EXCHANGE LISTINGS FOR MINING COMPANIES WWW.MONTSAME.MN PUBLISHED:2026/02/26      6 TMK ENERGY SETS NEW GAS OUTPUT RECORD AT MONGOLIAN CSG PILOT WWW.TIPRANKS.COM PUBLISHED:2026/02/26      7 WILL MONGOLIA BAN SOCIAL NETWORKS FOR CHILDREN, AS AUSTRALIA AND FRANCE HAVE DONE? WWW.OPEN.KG PUBLISHED:2026/02/26      8 FOREIGN TRADE TURNOVER REACHES USD 2.6 BILLION WWW.MONTSAME.MN PUBLISHED:2026/02/25      9 MONGOLIA REVOKES PERMITS OF SIX FOREIGN NGOS WWW.MONTSAME.MN PUBLISHED:2026/02/25      10 MINING DRIVES MONGOLIA’S ECONOMY AS REFORM MOMENTUM BUILDS WWW.EASTASIAFORUM.ORG PUBLISHED:2026/02/25      БӨӨРӨЛЖҮҮТИЙН ЦАХИЛГААН СТАНЦ 300 САЯ АМ.ДОЛЛАРЫН САНХҮҮЖИЛТ АМЖИЛТТАЙ БОСГОЛОО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/26     ГАДААДЫН 95 ИРГЭНИЙГ УЛСЫН ХИЛЭЭР ОРУУЛАЛГҮЙ БУЦААЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/26     ЗЭСИЙН БАЯЖМАЛ ХАЙЛУУЛАХ, БОЛОВСРУУЛАХ ҮЙЛДВЭРИЙН ХӨРӨНГӨ ОРУУЛАГЧИЙГ ИРЭХ ТАВДУГААР САРД ТОДРУУЛНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/26     УЛААНБААТАР-ЛҮНГИЙН ЗАМЫГ ЗУРГААН ЭГНЭЭ БОЛГОНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/26     ЖАЙКА БОЛОН МТҮП МЭДЭЭЛЭЛ ТЕХНОЛОГИЙН САЛБАРЫГ ХӨГЖҮҮЛЭХ ТӨСЛИЙГ ХЭРЭГЖҮҮЛЖ ЭХЭЛЛЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/26     ЕРӨНХИЙ САЙДЫН АХЛАХ ЗӨВЛӨХ БӨГӨӨД АЖЛЫН АЛБАНЫ ДАРГААР Ж.САНДАГСҮРЭНГ ТОМИЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/26     БАРАА БҮТЭЭГДЭХҮҮНИЙ ҮНЭ САРЫН ХУГАЦААНД 2.7 ХУВИАР ӨСЧЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/26     НИЙСЛЭЛ ЗАРДЛАА ТЭЛЖ, ТРАМВАЙН ТӨСӨЛД 350 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/25     САНГИЙТ КАУР ДЕО: МАЛАЙЗЫН ТӨР БУРУУТАЙ ГЭДГИЙГ ШИЙДҮҮЛЭХ ЭЦСИЙН БОЛОМЖ УЧРААС МОНГОЛЫН ТӨР ХАМТРАН АЖИЛЛАХЫГ ХҮСЭЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     НИЙСЛЭЛИЙН ТӨСӨВ: COP17 ХУРАЛД 70 ТЭРБУМ ЗАРЦУУЛЖ, 200 ТЭРБУМЫН БОНД БОСГОЖ V ЦАХИЛГААН СТАНЦ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Project of Mongolian scientists gains international recognition www.montsame.mn

Ulaanbaatar /MONTSAME/ Scientists of Mongolia and Japan are collaborating on the development of a technology for the restoration of degraded pastureland.
Specifically, the Project titled ‘Restoration of Pastureland by Effective Usage of Wild Forage Plants based on Traditional Knowledge of Nomadic Mongolians’ developed by Mongolian scientists has been selected in an international scientific grant program and a group of Mongolian scientists have begun working together with leading Japanese scientists.
The project is one of the three projects shortlisted from 42 Bio-resources projects that competed for SATREPS (Science and Technology Research Partnership for Sustainable Development) program, implemented by the Japan Science and Technology Agency. Leading scientists at the Mongolian University of Life Sciences (MULS), Institute of Veterinary Medicine, Ecosystem Research Center, the Research Institute of Animal Husbandry, University of Tokyo, Kyoto University, and Tohoku Medical and Pharmaceutical University and the National Agriculture and Food Research Organization and some enterprises of Japan are collaborating in the project led by Professor of the National University of Mongolia J.Batkhuu.
As part of the project, a pastureland restoration technology will be developed through studying climate-resistant, fast growing wild plants beneficial to animal health and introduced into agriculture and veterinary medicine.
A study conducted by the MULS Ecosystem Research Center shows that 22.6 percent or 25 million ha of pastureland in Mongolia has degraded. The project is of great significance as studies and observations conducted over the last 20 years have found that the degraded pastureland cannot restore itself naturally. The project will be implemented for 5 years with annual funding support of MNT 1.4 billion.


Published Date:2021-01-28