1 GOVERNMENT ORDERS UNINTERRUPTED GOAL TRANSPORTATION THROUGH GASHUUNSUKHAIT, KHANGI BORDER CROSSINGS WWW.MONTSAME.MN PUBLISHED:2026/02/26      2 CONCESSIONAL LOAN AGREEMENT SIGNED UNDER ‘WHITE GOLD’ NATIONAL MOVEMENT WWW.MONTSAME.MN PUBLISHED:2026/02/26      3 MONGOLIA MOVES TO NEXT STAGE OF COPPER SMELTER SELECTION PROCESS WWW.MONTSAME.MN PUBLISHED:2026/02/26      4 INVESTMENT OPPORTUNITY IN MONGOLIAN MINING INTRODUCED IN LONDON WWW.MONTSAME.MN PUBLISHED:2026/02/26      5 MONGOLIA SEEKS LONDON STOCK EXCHANGE LISTINGS FOR MINING COMPANIES WWW.MONTSAME.MN PUBLISHED:2026/02/26      6 TMK ENERGY SETS NEW GAS OUTPUT RECORD AT MONGOLIAN CSG PILOT WWW.TIPRANKS.COM PUBLISHED:2026/02/26      7 WILL MONGOLIA BAN SOCIAL NETWORKS FOR CHILDREN, AS AUSTRALIA AND FRANCE HAVE DONE? WWW.OPEN.KG PUBLISHED:2026/02/26      8 FOREIGN TRADE TURNOVER REACHES USD 2.6 BILLION WWW.MONTSAME.MN PUBLISHED:2026/02/25      9 MONGOLIA REVOKES PERMITS OF SIX FOREIGN NGOS WWW.MONTSAME.MN PUBLISHED:2026/02/25      10 MINING DRIVES MONGOLIA’S ECONOMY AS REFORM MOMENTUM BUILDS WWW.EASTASIAFORUM.ORG PUBLISHED:2026/02/25      БӨӨРӨЛЖҮҮТИЙН ЦАХИЛГААН СТАНЦ 300 САЯ АМ.ДОЛЛАРЫН САНХҮҮЖИЛТ АМЖИЛТТАЙ БОСГОЛОО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/26     ГАДААДЫН 95 ИРГЭНИЙГ УЛСЫН ХИЛЭЭР ОРУУЛАЛГҮЙ БУЦААЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/26     ЗЭСИЙН БАЯЖМАЛ ХАЙЛУУЛАХ, БОЛОВСРУУЛАХ ҮЙЛДВЭРИЙН ХӨРӨНГӨ ОРУУЛАГЧИЙГ ИРЭХ ТАВДУГААР САРД ТОДРУУЛНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/26     УЛААНБААТАР-ЛҮНГИЙН ЗАМЫГ ЗУРГААН ЭГНЭЭ БОЛГОНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/02/26     ЖАЙКА БОЛОН МТҮП МЭДЭЭЛЭЛ ТЕХНОЛОГИЙН САЛБАРЫГ ХӨГЖҮҮЛЭХ ТӨСЛИЙГ ХЭРЭГЖҮҮЛЖ ЭХЭЛЛЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/26     ЕРӨНХИЙ САЙДЫН АХЛАХ ЗӨВЛӨХ БӨГӨӨД АЖЛЫН АЛБАНЫ ДАРГААР Ж.САНДАГСҮРЭНГ ТОМИЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/26     БАРАА БҮТЭЭГДЭХҮҮНИЙ ҮНЭ САРЫН ХУГАЦААНД 2.7 ХУВИАР ӨСЧЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/26     НИЙСЛЭЛ ЗАРДЛАА ТЭЛЖ, ТРАМВАЙН ТӨСӨЛД 350 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/25     САНГИЙТ КАУР ДЕО: МАЛАЙЗЫН ТӨР БУРУУТАЙ ГЭДГИЙГ ШИЙДҮҮЛЭХ ЭЦСИЙН БОЛОМЖ УЧРААС МОНГОЛЫН ТӨР ХАМТРАН АЖИЛЛАХЫГ ХҮСЭЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     НИЙСЛЭЛИЙН ТӨСӨВ: COP17 ХУРАЛД 70 ТЭРБУМ ЗАРЦУУЛЖ, 200 ТЭРБУМЫН БОНД БОСГОЖ V ЦАХИЛГААН СТАНЦ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

IEA gives world reality check on ‘dirty’ coal use www.rt.com

The International Energy Agency (IEA) said on Friday that rising consumption in China, India and the US could bring the demand for global coal-fired power to a new high this year, despite efforts to cut greenhouse gas emissions.
According to the report, global power generation from coal is expected to grow by 9%, reaching 10,350 terawatt-hours. The growth will be driven by a rapid economic recovery that has “pushed up electricity demand much faster than low-carbon supplies can keep up.”
The IEA highlighted that overall coal demand, including for industries such as cement and steel, could rise by 6% this year. It will not exceed the record consumption levels of 2013 and 2014, but could hit a new all-time high next year, the IEA warned.
The increase is “a worrying sign of how far off track the world is in its efforts to put emissions into decline towards net zero,” said IEA Executive Director Fatih Birol.
China, which consumes more than half of the world’s coal, is expected to see a 9% year-on-year increase in global coal-fired power generation in 2021. India’s generation is forecast to rise by 12% this year.
As part of the climate talks in Glasgow last month, countries finally agreed to “phase down” coal consumption to keep global temperature rises as close to 1.5 degrees Celsius as possible. China has also pledged to start reducing coal consumption, but will do so only after 2025.
 
 
 


Published Date:2021-12-20