1 WORLD BANK PROJECTS 5% ECONOMIC GROWTH FOR MONGOLIA IN 2026 WWW.MONTSAME.MN PUBLISHED:2026/04/12      2 MONGOLIA TO IMPLEMENT PROJECT TO REDUCE HAZARDOUS CHEMICAL USE WWW.MONTSAME.MN PUBLISHED:2026/04/12      3 PM UCHRAL HOLDS TALKS WITH RUSSIAN AMBASSADOR ON FUEL SUPPLIES WWW.MONTSAME.MN PUBLISHED:2026/04/12      4 WORLD CIRCUS IN MONGOLIA 2026 SHOW TO OPEN SOON WWW.OPEN.KG PUBLISHED:2026/04/12      5 WORLD BANK: MONGOLIA’S ECONOMY STAYS RESILIENT BUT FACES RISING UNCERTAINTY WWW.RELIEFWEB.INT/ PUBLISHED:2026/04/10      6 CAN UCHRAL HOLD ON? BEYOND MONGOLIA’S LEADERSHIP SHAKE-UP WWW.THEDIPLOMAT.COM PUBLISHED:2026/04/10      7 $6 MILLION DIGITAL PROJECT LAUNCHED FOR CHINGGIS KHAAN MUSEUM WWW.ZSM.MN PUBLISHED:2026/04/10      8 STEEL PLANT WORTH $800 MILLION TO BE BUILT IN MONGOLIA WWW.AKIPRESS.COM PUBLISHED:2026/04/10      9 TMK GAS SURGE CLEARS PATH TO PRODUCTION AT MONGOLIAN PROJECT WWW.THEWEST.COM.AU PUBLISHED:2026/04/10      10 5 CHILDREN DIE FROM MENINGOCOCCAL DISEASE AND MEASLES WWW.UBPOST.MN PUBLISHED:2026/04/10      БАРИЛГЫН КОМПАНИУД ТӨСЛИЙНХӨӨ 30 ХҮРТЭЛХ ХУВИЙГ ӨӨРИЙН ХӨРӨНГӨӨР ГҮЙЦЭТГЭЖ БАЙЖ ЗАХИАЛГА АВДАГ БОЛНО WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/12     МОНГОЛ УЛСАД АМЬДАРЧ БУЙ 5153 ИРГЭНИЙ ОРШИН СУУХ ЗӨВШӨӨРЛИЙГ ХАСЧЭЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/12     ГАНГИЙН ҮЙЛДВЭРИЙГ ДАРХАН-УУЛ АЙМАГТ БАРИНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/12     10 САЯ ПАУНДЫН ДЭМЖЛЭГИЙГ ҮРГЭЛЖЛҮҮЛЭХ ХҮСЭЛТ ТАВИВ WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/12     ҮСХ: ГАДААД ХУДАЛДААНЫ НӨХЦӨЛИЙН ИНДЕКС ӨМНӨХ ОНООС 13 ХУВИАР ӨСӨВ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/10     ЭРЧИМ ХҮЧНИЙ ИНЖЕНЕР Д.ТЭНГИС: ₮3.5 ИХ НАЯДААР НАЙМАН ЖИЛИЙН ХУГАЦААНД УЛААНБААТАРЫГ УТААГҮЙ БОЛГОХ БОЛОМЖТОЙ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/04/10     АРХЕОЛОГИ, УГСААТНЫ МУЗЕЙ 80 ХУВИЙН ГҮЙЦЭТГЭЛТЭЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/04/10     3–5 МЯНГАН ТОНН ҮРИЙН ТӨМС ЗЭЭЛИЙН НӨХЦӨЛӨӨР НИЙЛҮҮЛНЭ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/10     ДЭЛХИЙН БАНК: 2026 ОНД МОНГОЛЫН ЭДИЙН ЗАСАГ 5 ХУВЬ ӨСӨХ ХҮЛЭЭЛТТЭЙ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/04/09     “PLAYTIME” НААДМЫН ЭХНИЙ АРГА ХЭМЖЭЭ СҮХБААТАРЫН ТАЛБАЙД БОЛНО WWW.EAGLE.MN НИЙТЭЛСЭН:2026/04/09    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Talon finds new gas in Perth Basin as second Mongolia well underway www.marketindex.com.au

Talon Energy (ASX:TPD) through its Perth Basin partnership with Strike Energy (ASX:STX) has drilled a new well in the Perth Basin Cattamarra Coal Measures, Walyering-6, revealing a new gas discovery in the Cadda Formation with 4m of net pay at 2,683m depth.
On top of the new Cadda gas discovery, the partnership has also struck a 21m thick payload in the Cattamarra Sandstones.
Meanwhile, new production test results for Walyering-5 provide evidence suggesting a large connected gas field underneath the ground, a promising indication for the forward development of the Walyering gas field.
Strike Energy Limited holds 55% of the JV, and Talon Energy retains 45%; the project is in the boundaries of WA permit EP447.
Gas bearing geology detected in the Cattamarra Sandstones are located mostly across the B & C Sands, with the A Sand returning low gas saturation (blamed on a breached seal,) and, the D Sand containing "immaterial" streaks of net gas pay.
Based on this, Walyering-6 will target the B & C Sands for future production testing of Walyering-6. Samples of gas from the newly identified Cadda Formation well will be sent to a laboratory for compositional analysis; the Cadda target will be included in the Walyering-6 flow test.
Across to Mongolia…
Investors will also be interested in looking across to Mongolia, where Talon Energy has commenced drilling its Snow-Leopard 2 well onsite the Gurvantes XXXV CSG project in the Southern Gobi.
That well is being spud alongside project partner TMK Energy (ASX:TMK). TMK Energy's share price is up 10% in post-lunch trades. The two Australian companies are two of a small handful of players active in the Mongolia region, both companies report a good standing with government resources officials.
SL-2 is underway as the results from SL-1 remain pending with the company confident gas contents will reflect the upper end of estimates attached to initial data.
Snow Leopard-2 is located some 5km to the east of SL-1. Talon Energy notes upon the completion of SL-2, a further two drill holes will be launched on-site "over the next 2-3 months."
After all four wells are drilled, data from the quad will be used to inform the design of a pilot well program intended to de-risk the asset and demonstrate the commercial potential of the development of gas resources on-site the company's mammoth Mongolian acreage.
Talon expects the pilot well program to launch in the second half of 2022.


Published Date:2022-05-16