1 FOREIGN TRADE TURNOVER REACHES USD 2.6 BILLION WWW.MONTSAME.MN PUBLISHED:2026/02/25      2 MONGOLIA REVOKES PERMITS OF SIX FOREIGN NGOS WWW.MONTSAME.MN PUBLISHED:2026/02/25      3 MINING DRIVES MONGOLIA’S ECONOMY AS REFORM MOMENTUM BUILDS WWW.EASTASIAFORUM.ORG PUBLISHED:2026/02/25      4 P.NARANBAYAR ANNOUNCES PLAN TO DRAFT LAW TO RESTRICT CHILDREN’S USE OF SOCIAL NETWORKS WWW.GOGO.MN PUBLISHED:2026/02/25      5 “EAGLE FESTIVAL-2026” TO BE HELD ON MARCH 7-8 WWW.GOGO.MN PUBLISHED:2026/02/24      6 BEATE DASTEL: UNICEF WILL CONTINUE THE IMPLEMENTATION OF SUCCESSFUL PROJECTS AND PROGRAMS IN MONGOLIA WWW.OPEN.KG PUBLISHED:2026/02/24      7 SAXAUL TREE CULTIVATED IN WINTER GREENHOUSE FOR FIRST TIME IN MONGOLIA WWW.MONTSAME.MN PUBLISHED:2026/02/24      8 MONGOLIA'S PROPOSED SENIOR UNSECURED NOTES ASSIGNED 'BB-' LONG-TERM FOREIGN CURRENCY RATING WWW.SPGLOBAL.COM PUBLISHED:2026/02/24      9 MOODY’S ASSIGNS B1 RATING TO MONGOLIA BONDS ON REFINANCING PLAN WWW.IN.INVESTING.COM PUBLISHED:2026/02/24      10 THE 2250-KM, MORE DIVERSE ALTERNATIVE TO THE TRANS-SIBERIAN RAILWAY WWW.BRISBANETIMES.COM.AU PUBLISHED:2026/02/24      НИЙСЛЭЛ ЗАРДЛАА ТЭЛЖ, ТРАМВАЙН ТӨСӨЛД 350 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/25     САНГИЙТ КАУР ДЕО: МАЛАЙЗЫН ТӨР БУРУУТАЙ ГЭДГИЙГ ШИЙДҮҮЛЭХ ЭЦСИЙН БОЛОМЖ УЧРААС МОНГОЛЫН ТӨР ХАМТРАН АЖИЛЛАХЫГ ХҮСЭЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     НИЙСЛЭЛИЙН ТӨСӨВ: COP17 ХУРАЛД 70 ТЭРБУМ ЗАРЦУУЛЖ, 200 ТЭРБУМЫН БОНД БОСГОЖ V ЦАХИЛГААН СТАНЦ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     ХӨРСНИЙ УС, ҮЕРИЙН ХАМГААЛАЛТЫН ТӨСЛИЙН ТЭЗҮ-ИЙГ БОЛОВСРУУЛАХ АЖИЛ 90 ХУВЬТАЙ ХЭРЭГЖИЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24     COP17 БАГА ХУРЛЫН БЭЛТГЭЛ ХАНГАХ ХҮРЭЭНД ТЕНДЕРГҮЙ, ШУУД ХУДАЛДАН АВАЛТ ХИЙХ ЭРХИЙГ ӨГЧЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24     "ЭРДЭНЭБҮРЭНГИЙН УСАН ЦАХИЛГААН СТАНЦЫН АЖЛЫН ЯВЦ 20 ХУВЬТАЙ БАЙНА" WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/24     ТӨМӨР ЗАМЫН ТЕРМИНАЛЫН ДЭД БҮТЦИЙГ САНХҮҮЖҮҮЛЭХ САНАЛ ТАВЬЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/24     НИЙСЛЭЛД ЖИЛДЭЭ 44.420 ТОНН ХУВАНЦАРЫГ ДАХИН БОЛОВСРУУЛНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/24     МОНГОЛ УЛС, БНСУ-ЫН ГХЯ ХООРОНДЫН СТРАТЕГИЙН УУЛЗАЛТ БОЛОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/24     ДҮҮЖИН ЗАМЫН ТЭЭВЭР ТӨСЛИЙН ЯВЦ 60.5 ХУВЬТАЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/24    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

TMK, Talon Energy hit strong coal-gas deposits in Mongolia www.marketindex.com.au

TMK Energy (ASX:TMK) and Talon Energy (ASX:TPD) have jointly announced the discovery of a 70 metre thick gas-bearing coal body at 167 metres depth onsite the partnerships’ Mongolia-based Gurvantes CSG Project in the southern region of Mongolia’s Gobi Desert, Nariin Sukhait.
TMK holds a 100% interest in the project, Talon Energy retains a 33% working interest which it acquired via farm-out last year.
Preliminary results from downhole the recently spud Snow Leopard-2 well (SL-02) “indicate high gas contents,” the partnership states, and is currently at a depth of 360 metres.
The 70m thick coal body identified today was located at 167m depth, a relatively shallow depth compared to the full capability of the drill rig on-site.
The total planned depth for SL-02 sees it conclude at 600m. Upon completion of the drill run, further downhole tests will be conducted.
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
(Source: Talon Energy) A map detailing the location of the Gurvantes Project
Promising signs already for first two Gurvantes wells
The partnership interprets initial gas results to reflect gas contents of between 11.4 metres cubed per tonne and 15.2m3/t.
Meanwhile, the company continues to interpret datasets from the Snow Leopard-1 well, with over 40 samples being used to build a better idea of geology and recoverable downhole gas.
Coal quality data, according to the partnership, indicates bituminous coal ranked in between A and B types, consistent with the Surat and Bowen Basin CSG geologies in Australia.
Harsh terrain impacting equipment, but nothing major
While the results are promising news for the partnership, it did note some operational challenges in carrying out technical tests in SL-02 due to the quality of equipment, hole conditions, and “testing methods.”
The partnership expects these issues to be remedied quickly, and do not threaten the economics of the project.
New equipment is being mobilised on-site.
WRITTEN BY
Jonathon Davidson
Journalist
Jonathon is a journalism graduate and avid market watcher with exposure to governance, NGO and mining environments. He was most recently hired as an oil and gas specialist for a trade publication.


Published Date:2022-05-23