1 MONGOLIA WANTS TO INCREASE IMPORTS OF OIL, PETROLEUM PRODUCTS FROM KAZAKHSTAN WWW.INTERFAX.COM PUBLISHED:2026/03/24      2 CHAIRMAN UCHRAL HOLDS TALKS WITH CHAIRMAN ZHAO LEJI WWW.MONTSAME.MN PUBLISHED:2026/03/24      3 MONGOLIA-UK ROUNDTABLE MEETING HELD WWW.MONTSAME.MN PUBLISHED:2026/03/24      4 RESIDENTS OF UVS PROVINCE EXPRESS SUPPORT FOR BILL TO RECALL PARLIAMENT MEMBERS WWW.GOGO.MN PUBLISHED:2026/03/24      5 B.ENKHBAYAR: L.OYUN-ERDENE MADE FOUR OF THE SIX OFFTAKE AGREEMENTS. HE IS TALKING ABOUT THE CORRUPTION THAT HE RECEIVED WWW.GOGO.MN PUBLISHED:2026/03/24      6 SPEAKER VISITS BEIJING ROBOTICS INDUSTRIAL PARK WWW.MONTSAME.MN PUBLISHED:2026/03/24      7 45TH ANNIVERSARY OF THE FIRST MONGOLIAN IN SPACE MARKED WWW.MONTSAME.MN PUBLISHED:2026/03/24      8 MONGOLIA HAS ONCE AGAIN PROVEN TO BE AN ISLAND OF FREEDOM, ACCORDING TO THE WORLD FREEDOM INDEX WWW.OPEN.KG PUBLISHED:2026/03/23      9 WORKING GROUP RECOVERS MNT 120 BILLION IN DEBTS OVER SIX MONTHS WWW.MONTSAME.MN PUBLISHED:2026/03/23      10 SPACE COOPERATION CONFERENCE MARKS MILESTONE IN MONGOLIA’S SPACE HISTORY WWW.MONTSAME.MN PUBLISHED:2026/03/23      Ж.ЭНХБАЯР: КОРОНАВИРУСТ ЦАР ТАХЛЫН ҮЕД ХЭРЭГЖҮҮЛСЭНТЭЙ АДИЛ ДАЙНЫ ХУУЛИЙН ТӨСЛИЙГ ӨРГӨН МЭДҮҮЛНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/03/24     МАН-ЫН ДАРГА Н.УЧРАЛ ХКН-ЫН ТӨВ ХОРООНЫ УЛС ТӨРИЙН ТОВЧООНЫ БАЙНГЫН ХОРООНЫ ГИШҮҮН ЦАЙ ЧИТАЙ УУЛЗАВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/03/24     Ж.ЭНХБАЯР: ШАТАХУУНЫ ҮНЭ 20 ХУВИАР НЭМЭГДЭХЭД ИНФЛЯЦ НЭГ ХУВИАР ӨСӨХ МАГАДЛАЛТАЙ WWW.EAGLE.MN НИЙТЭЛСЭН:2026/03/24     “АЗИЙН АВТО ЗАМЫН СҮЛЖЭЭГЭЭР ОЛОН УЛСЫН АВТОТЭЭВЭРЛЭЛТ ГҮЙЦЭТГЭХ ТУХАЙ” ХЭЛЭЛЦЭЭРТ БЭЛТГЭЖ БАЙНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/03/24     БОРТЭЭГИЙН ОРДОД ХӨРӨНГӨ ОРУУЛАЛТ ХИЙЖ ХАМТРАН АЖИЛЛАХААР 7 АЖ АХУЙН НЭГЖ, КОНСОРЦИУМ САНАЛ ИРҮҮЛЖЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/03/24     "ОЙРХ ДОРНОДЫН АСУУДЛААС ҮҮДЭЖ ДИЗЕЛЬ ТҮЛШ, ШАТАХУУНЫ ҮНЭ НЭМЭГДЭХ ЭРСДЭЛ ҮҮСЭЖ БАЙНА" WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/24     Б.ГАНХУЯГ ХУГАЦААНААСАА 6 САРЫН ӨМНӨ БУЮУ ЭНЭ ДОЛОО ХОНОГТ СУЛЛАГДАХААР БОЛЖЭЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/24     МОНГОЛ, БРИТАНИЙН ХАРИЛЦААГ ИЖ БҮРЭН ТҮНШЛЭЛИЙН ТҮВШИНД ХҮРГЭХЭЭР ХЭЛЭЛЦЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/03/23     АПУ ДЭЙРИ ХХК-ИЙН ШИНГЭН СҮҮНИЙ ҮЙЛДВЭРЛЭЛ ӨДӨРТ 10 ТОННООР НЭМЭГДЛЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/03/23     ТУУЛЫН ХУРДНЫ ЗАМ АШИГЛАЛТАД ОРСНООР ГОЛ ГУДАМЖ ЗАМЫН ХӨДӨЛГӨӨНИЙ АЧААЛАЛ 13.5 ХУВИАР БУУРНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/03/23    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

Parabellum Resources has diamond drill spinning at advanced Khotgor REE Project in mineral-rich southern Mongolia www.proactiveinvestors.com.au

Parabellum Resources Ltd (ASX:PBL) has the diamond drill spinning for a 2,000-metre program at the Khotgor Rare Earth Elements (REE) Project in resource-rich southern Mongolia, northwest of the world-class Oyu Tolgoi mine.
The metallurgical drilling along with a bulk sampling program will target the higher-grade resource areas to obtain a 50-tonne bulk metallurgical sample for a JORC definitive feasibility study (DFS) at the project.
This study is scheduled to commence in the June quarter of 2023, subject to completing a scoping study in the first quarter of 2023.
Potential to be major NdPr supplier
Khotgor is touted as one of the world’s largest undeveloped rare earth deposits with the potential to be a major supplier of high-value NdPr (neodymium-praseodymium) and Parabellum aims to demonstrate this with aggressive exploration and pre-development programs.
NdPr is facing strong and growing demand as it is a vital material needed to magnets and therefore, future wind power generation.
Shares higher
Parabellum non-executive chairman Mark Hohnen said: “We are delighted that the technical team at Temarise has been able to deploy the first of two drill rigs, drill crews and geologists to site in order to commence the 2,000-metre drill program without delay.
"The project has clear objectives to target higher-grade areas within the initial 20-year pit design shell and deliver the required bulk sample for the JORC feasibility study; both being critical steps to delivering our objectives set out in the work programs for the remainder of 2022.”
Investors have welcomed the start of drilling, driving the share price up by as much as 4.69% to $0.335.
Metallurgical drilling
PBL has initially planned about 14 holes of metallurgical infill drilling for a total drill program of 2,000 metres, mainly within the initial 10 years of the open pit design plan.
These holes will be between 150 metres and 200 metres in depth, with an average depth of 170 metres. Large PQ diameter core holes will be drilled to maximise core sample recovery.
The 2,000-metre drill program, which is being managed by the Temarise technical team established in Mongolia, is scheduled to be completed within 10 weeks.
Additionally, Parabellum will take ore samples from a number of surface trenches to be used for further geotechnical test-work.
Preparing bulk sample
In total, approximately 50 tonnes of sample will be collected for use in the DFS with core samples to be used for a variety of comminution, variability and geotechnical test-work.
Sample preparation will be undertaken in Ulaanbaatar before the end of the year. The bulk sample will then be shipped to ALS Labs based in Perth, Western Australia, and is scheduled to arrive in the June quarter of 2023.
Core will also be combined with ore from the surface trenching to produce a bulk flotation concentrate to optimise the metallurgical flow sheet being developed for the scoping study stage.
The flotation concentrate will subsequently be used to optimise the hydrometallurgical flowsheet being designed to produce an NdPr saleable product.
Looking south over the Khotgor leases.
Parabellum has previously entered into an agreement with Temarise Limited (UK) that holds the exclusive option to acquire 80% of Khotgor REE Project.
The company also holds a 100% interest in four projects in a highly prospective region in New South Wales, Australia, offering exposure to copper and gold.


Published Date:2022-09-20