1 RIO-GLENCORE DEAL CLOSER THAN EVER WITH PREMIUM AND CEO IN FOCUS WWW.BLOOMBERG.COM PUBLISHED:2026/01/10      2 MONGOLIA'S INFLATION DOWN TO 7.5 PCT IN DECEMBER 2025 WWW.XINHUANET.COM PUBLISHED:2026/01/10      3 MONGOLIA ENERGY FACES MNT 412.3 BILLION TAX LIABILITY AFTER LOSING MONGOLIAN COURT CASE WWW.TIPRANKS.COM  PUBLISHED:2026/01/10      4 NUMBER OF FOREIGN NATIONALS RESIDING FOR OFFICIAL AND PRIVATE PURPOSES UP 7.4% WWW.MONTSAME.MN PUBLISHED:2026/01/10      5 SUSTAINABILITY RELATED REPORTING: READINESS ASSESSMENT MONGOLIA REPORT WWW.UNDP.ORG PUBLISHED:2026/01/10      6 GOVERNMENT TO FORMALLY APPROACH RIO TINTO, OYU TOLGOI TO SAFEGUARD NATIONAL INTEREST WWW.MONTSAME.MN PUBLISHED:2026/01/09      7 NON-COMPLIANT ADVERTISING BILLBOARDS TO BE REMOVED WWW.MONTSAME.MN PUBLISHED:2026/01/09      8 FROM TORONTO, CANADA TO PHU QUOC, VIETNAM: MONGOLIA’S BOLD 2026 AVIATION EXPANSION INCLUDES NEW FLIGHTS, VISA-FREE TRAVEL, AND AIRPORT UPGRADES! WWW.TRAVELANDTOURWORLD.COM PUBLISHED:2026/01/09      9 MONGOLIA TO MARK 820TH ANNIVERSARY OF THE GREAT MONGOL EMPIRE WWW.MONTSAME.MN PUBLISHED:2026/01/09      10 PARLIAMENT SUPPORTS SOLAR GER INITIATIVE UNDER NEW REGULATORY REFORMS WWW.MONTSAME.MN PUBLISHED:2026/01/09      Б.ДЭЛГЭРСАЙХАН: ХӨШИГИЙН ХӨНДИЙН ТӨМӨР ЗАМ, НАВИГАЦЫН ТОНОГ ТӨХӨӨРӨМЖИЙН ШИНЭЧЛЭЛИЙГ ЭНЭ ОНД ДУУСГАНА WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/11     УРЬДЧИЛАН ЗАХИАЛГА ӨГСӨН 260 ИРГЭНИЙГ ХОЁР ТЭРБУМ ТӨГРӨГӨӨР ХОХИРООЖЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/11     GLENCORE, RIO TINTO КОМПАНИУД НЭГДЭХ ХЭЛЭЛЦЭЭ ХИЙЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/10     Н.НАРАНБААТАР: ЭНЭ ОНД НҮҮРСНИЙ ЭКСПОРТЫН ХЭМЖЭЭГ 90 САЯ ТОННД БАРИНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/01/10     УЛААНБААТАРТ ӨНДӨР ТЕХНОЛОГИЙН ХОЁР ҮЙЛДВЭР БАЙГУУЛЖ, УСАН ХАНГАМЖИЙГ 80 ХУВИАР НЭМЭГДҮҮЛЛЭЭ WWW.GOGO.MN НИЙТЭЛСЭН:2026/01/09     ХУУЛЬ БУС ЭЗЭМШИЛД БАЙСАН 15 БАРИЛГА БАЙГУУЛАМЖИЙГ НИЙСЛЭЛД БУЦААН АВЧЭЭ WWW.NEWS.MN НИЙТЭЛСЭН:2026/01/09     МОНГОЛ УЛСАД 37 097 ГАДААД ИРГЭН ОРШИН СУУХ БҮРТГЭЛТЭЙ БАЙНА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/09     ҮСХ: 12 ДУГААР САРЫН ИНФЛЯЦ 7.5 ХУВЬТАЙ ГАРЛАА WWW.EAGLE.MN НИЙТЭЛСЭН:2026/01/09     2026 ОНД НИЙСЛЭЛД ХЭРЭГЖИХ ТОМООХОН БҮТЭЭН БАЙГУУЛАЛТУУД WWW.ITOIM.MN НИЙТЭЛСЭН:2026/01/09     ДУЛААНЫ ТАРИФ НЭМЭГДҮҮЛЭХ ШИЙДВЭРИЙГ ХОЙШЛУУЛЖ, 2027 ОНЫ НЭГДҮГЭЭР САРЫН 1-НЭЭС НЭМНЭ WWW.EGUUR.MN НИЙТЭЛСЭН:2026/01/09    

ADB Launches Grid-Connected Solar And Battery Energy System In Uliastai, Mongolia www.indiaeducationdiary.in

Zavkhan — The Asian Development Bank (ADB) and the Government of Mongolia inaugurated a grid-connected renewable hybrid energy system in Zavkhan province. The system includes a 5 megawatt solar photovoltaic and 3.6 megawatt-hour battery energy storage system (BESS), along with an advanced energy management system in Uliastai, servicing mostly rural areas in the western region.
“Thanks to this project, more than 48,000 consumers of more than 8,000 households in Altai-Uliastai region will receive clean and reliable energy,” said the Head of Renewable Energy Division of the Ministry of Energy Byekbolat Khalik. “In addition to reduced electricity loss and improved quality of and access to electricity, the system is estimated to cut 223,813 tons of carbon dioxide emissions over the next 25 years.”
The hybrid system will provide about 8.8 million kilowatt-hour (kWh) solar-generated and 1.3 million kWh charged and discharged energy in the Altai-Uliastai energy system, under the ADB’s Upscaling Renewable Energy Sector Project. The project was approved in September 2018 with loan financing from ADB and grant cofinancing from the Strategic Climate Fund and the Japan Fund for the Joint Crediting Mechanism (JFJCM). The project supports 41 MW of distributed renewable energy systems through subprojects that will use a range of renewable energy technologies to supply clean electricity and heat in the less-developed region of western Mongolia. The Uliastai grid-connected solar photovoltaic and BESS hybrid system subproject is cofinanced with a $6 million grant from the JFJCM.
“The Uliastai subproject builds the very first utility and mega-scale battery system in the country combined with grid-connected renewable energy,” said ADB Principal Energy Specialist for East Asia Shannon Cowlin. “The system will provide secure power supply to the residents and reduce localized air pollution, which affects even isolated regions of Mongolia during winter months.”
Among the Uliastai subproject’s innovations is the adoption of a sodium–sulfur battery, also known as a NAS battery, which can operate for longer period than other types of BESS technologies (up to 15 years), has better fire safety, and is more robust against Mongolia’s harsh winters. The BESS is designed to supply the Altai-Uliastai energy system during its peak hours in the evening by time-shifting excess solar energy generated during the daytime, increasing the share of renewable energy in the system.
The JFJCM is an ADB trust fund that aims to provide financial incentives for the adoption of advanced low-carbon technologies in ADB-financed and administered sovereign and nonsovereign projects.
ADB is committed to achieving a prosperous, inclusive, resilient, and sustainable Asia and the Pacific, while sustaining its efforts to eradicate extreme poverty. Established in 1966, it is owned by 68 members—49 from the region.


Published Date:2022-11-29