1 MONGOLIA INVESTMENT FORUM TAKES PLACE IN NEW YORK CITY WWW.MONTSAME.MN PUBLISHED:2025/04/30      2 MONGOLIA’S LENDMN SECURES $20M DEBT FINANCING FROM LENDABLE WWW.FINTECHFUTURES.COM  PUBLISHED:2025/04/30      3 JADE GAS CONFIRMS SIGNIFICANT GAS POTENTIAL IN MONGOLIA WWW.TIPRANKS.COM  PUBLISHED:2025/04/30      4 TRANSFORMING REMOTE MINING: HOW IPCC TECHNOLOGY CAN REDEFINE OPEN-PIT OPERATIONS IN MONGOLIA’S GOBI DESERT WWW.UBPOST.MN PUBLISHED:2025/04/30      5 MONGOLIA REMAINS UNDEFEATED AT THE ICE HOCKEY WORLD CHAMPIONSHIP 2025 DIVISION III WWW.MONTSAME.MN PUBLISHED:2025/04/30      6 PRIME MINISTER OYUN-ERDENE VISITS EGIIN GOL HYDROPOWER PLANT PROJECT SITE WWW.MONTSAME.MN PUBLISHED:2025/04/30      7 ‘I FELT CAUGHT BETWEEN CULTURES’: MONGOLIAN MUSICIAN ENJI ON HER BEGUILING, BORDER-CROSSING MUSIC WWW.THEGUARDIAN.COM PUBLISHED:2025/04/30      8 POWER OF SIBERIA 2: ECONOMIC OPPORTUNITY OR GEOPOLITICAL RISK FOR MONGOLIA? WWW.THEDIPLOMAT.COM PUBLISHED:2025/04/29      9 UNITED AIRLINES TO LAUNCH FLIGHTS TO MONGOLIA IN MAY WWW.MONTSAME.MN PUBLISHED:2025/04/29      10 SIGNATURE OF OIL SALES AGREEMENT FOR BLOCK XX PRODUCTION WWW.RESEARCH-TREE.COM  PUBLISHED:2025/04/29      ДӨРВӨН УЛИРЛЫН АЯЛАЛ ЖУУЛЧЛАЛЫН ҮЙЛ АЖИЛЛАГАА ЭРХЛЭГЧДЭД ХӨНГӨЛӨЛТТЭЙ ЗЭЭЛ ОЛГОНО WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/04/30     Н.УЧРАЛ: НЭЭЛТТЭЙ СОНГОН ШАЛГАРУУЛАЛТ ЗАРЛАЖ ҮҮСМЭЛ ОРДУУДЫГ АШИГЛУУЛДАГ БОЛНО WWW.EAGLE.MN НИЙТЭЛСЭН:2025/04/30     849 ТЭРБУМЫН ӨРТӨГТЭЙ "ГАШУУНСУХАЙТ-ГАНЦМОД" БООМТЫН ТЭЗҮ-Д ТУРШЛАГАГҮЙ, МОНГОЛ 2 КОМПАНИ ҮНИЙН САНАЛ ИРҮҮЛЭВ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/04/30     ХУУЛЬ БУСААР АШИГЛАЖ БАЙСАН "БОГД УУЛ" СУВИЛЛЫГ НИЙСЛЭЛ ӨМЧЛӨЛДӨӨ БУЦААВ WWW.NEWS.MN НИЙТЭЛСЭН:2025/04/30     МЕТРО БАРИХ ТӨСЛИЙГ ГҮЙЦЭТГЭХЭЭР САНАЛАА ӨГСӨН МОНГОЛЫН ГУРВАН КОМПАНИ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/04/30     "UPC RENEWABLES" КОМПАНИТАЙ ХАМТРАН 2400 МВТ-ЫН ХҮЧИН ЧАДАЛТАЙ САЛХИН ЦАХИЛГААН СТАНЦ БАРИХААР БОЛОВ WWW.EAGLE.MN НИЙТЭЛСЭН:2025/04/30     ОРОСЫН МОНГОЛ УЛС ДАХЬ ТОМООХОН ТӨСЛҮҮД ДЭЭР “ГАР БАРИХ” СОНИРХОЛ БА АМБИЦ WWW.EGUUR.MN НИЙТЭЛСЭН:2025/04/30     МОНГОЛ, АНУ-ЫН ХООРОНД ТАВДУГААР САРЫН 1-НЭЭС НИСЛЭГ ҮЙЛДЭНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/04/29     ЕРӨНХИЙ САЙД Л.ОЮУН-ЭРДЭНЭ ЭГИЙН ГОЛЫН УЦС-ЫН ТӨСЛИЙН ТАЛБАЙД АЖИЛЛАЖ БАЙНА WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/04/29     Ц.ТОД-ЭРДЭНЭ: БИЧИГТ БООМТЫН ЕРӨНХИЙ ТӨЛӨВЛӨГӨӨ БАТЛАГДВАЛ БУСАД БҮТЭЭН БАЙГУУЛАЛТЫН АЖЛУУД ЭХЛЭХ БОЛОМЖ БҮРДЭНЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2025/04/29    

Elixir Energy Eyes Production of Green Hydrogen in Mongolia and Piping it Next Door to China www.hydrogen-central.com

Elixir Energy eyes production of green hydrogen in Mongolia and piping it next door to China.
Elixir Energy Ltd (ASX:EXR) is focused on developing Gobi H2 – Mongolia’s first green hydrogen project (i.e. one where hydrogen is produced from renewable electrical energy sources).
The company’s rationale behind the Gobi H2 project is that producing green hydrogen in Mongolia and piping it to China is more energy efficient than transmitting power to China for hydrogen production.
hydrogen central advertise
The strength of the concept behind the project was demonstrated in mid-2022 when Elixir announced the signing of a memorandum of understanding (MOU) over Gobi H2 with Japan’s SB Energy Corp (now Terras Energy – 85% owned by Toyota Tsusho Corp).
Elixir procured a pre-feasibility study (PFS) from global consulting firm AECOM earlier this year to give the parties the confidence to advance the project – they are now aiming to enter into a binding JV later this year.
The PFS evaluated various configurations of wind, solar, battery and a grid connection to support a 10 MW (megawatt) electrolyser located at a site proximate to Terras Energy’s existing operated wind farm in the South Gobi region.
Emerging regional hydrogen infrastructure
The location of the Gobi H2 project provides ready access to the rapidly growing Chinese hydrogen markets.
Elixir commissioned a ‘Hydrogen in China’ market study from global energy consultants Rystad Energy which concluded “the scale of ramp up will likely open up imports from beneficial production sites like Elixir’s”.
Regional hydrogen transmission infrastructure is already emerging, including Sinopec’s recent announcement of a 400-kilometre hydrogen pipeline in inner Mongolia.
Advantages of pipeline
Around two-thirds of the cost of producing green hydrogen is the cost of renewables.
Elixir commissioned a ‘Hydrogen in China’ market study from global energy consultants Rystad Energy which concluded “the scale of ramp up will likely open up imports from beneficial production sites like Elixir’s”.
Regional hydrogen transmission infrastructure is already emerging, including Sinopec’s recent announcement of a 400-kilometre hydrogen pipeline in inner Mongolia.
Advantages of pipeline
Around two-thirds of the cost of producing green hydrogen is the cost of renewables.
Hydrogen has traditionally only been used in niche markets such as oil refineries – and has generally been produced from fossil fuels, with resultant large CO2 emissions.
The more recent pursuit of green and blue hydrogen (the latter is still derived from fossil fuels but the CO2 emissions are captured and stored underground) is driven solely by emission reduction aims.
Globally this is recognized by emerging standards that must be met for hydrogen to be deemed green or blue – each major jurisdiction is developing its own rules, but these are converging towards targets based on maximum CO2 emissions per kg of H2 produced.
Unless a green H2 project can meet these targets – it does not meet its intrinsic aims.
Projects which involve grid connections to electricity systems with still significant fossil fuel use (especially for production on the margin) may well struggle to be deemed green.
Elixir’s analysis illustrates that the Gobi H2 pilot project meets the green definitions of the main global jurisdictions – including China.
This will be critical to procure customers and project finance support.


Published Date:2023-06-15