1 FOREIGN TRADE TURNOVER REACHES USD 2.6 BILLION WWW.MONTSAME.MN PUBLISHED:2026/02/25      2 MONGOLIA REVOKES PERMITS OF SIX FOREIGN NGOS WWW.MONTSAME.MN PUBLISHED:2026/02/25      3 MINING DRIVES MONGOLIA’S ECONOMY AS REFORM MOMENTUM BUILDS WWW.EASTASIAFORUM.ORG PUBLISHED:2026/02/25      4 P.NARANBAYAR ANNOUNCES PLAN TO DRAFT LAW TO RESTRICT CHILDREN’S USE OF SOCIAL NETWORKS WWW.GOGO.MN PUBLISHED:2026/02/25      5 “EAGLE FESTIVAL-2026” TO BE HELD ON MARCH 7-8 WWW.GOGO.MN PUBLISHED:2026/02/24      6 BEATE DASTEL: UNICEF WILL CONTINUE THE IMPLEMENTATION OF SUCCESSFUL PROJECTS AND PROGRAMS IN MONGOLIA WWW.OPEN.KG PUBLISHED:2026/02/24      7 SAXAUL TREE CULTIVATED IN WINTER GREENHOUSE FOR FIRST TIME IN MONGOLIA WWW.MONTSAME.MN PUBLISHED:2026/02/24      8 MONGOLIA'S PROPOSED SENIOR UNSECURED NOTES ASSIGNED 'BB-' LONG-TERM FOREIGN CURRENCY RATING WWW.SPGLOBAL.COM PUBLISHED:2026/02/24      9 MOODY’S ASSIGNS B1 RATING TO MONGOLIA BONDS ON REFINANCING PLAN WWW.IN.INVESTING.COM PUBLISHED:2026/02/24      10 THE 2250-KM, MORE DIVERSE ALTERNATIVE TO THE TRANS-SIBERIAN RAILWAY WWW.BRISBANETIMES.COM.AU PUBLISHED:2026/02/24      НИЙСЛЭЛ ЗАРДЛАА ТЭЛЖ, ТРАМВАЙН ТӨСӨЛД 350 ТЭРБУМЫГ ЗАРЦУУЛНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/25     САНГИЙТ КАУР ДЕО: МАЛАЙЗЫН ТӨР БУРУУТАЙ ГЭДГИЙГ ШИЙДҮҮЛЭХ ЭЦСИЙН БОЛОМЖ УЧРААС МОНГОЛЫН ТӨР ХАМТРАН АЖИЛЛАХЫГ ХҮСЭЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     НИЙСЛЭЛИЙН ТӨСӨВ: COP17 ХУРАЛД 70 ТЭРБУМ ЗАРЦУУЛЖ, 200 ТЭРБУМЫН БОНД БОСГОЖ V ЦАХИЛГААН СТАНЦ БАРИНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/25     ХӨРСНИЙ УС, ҮЕРИЙН ХАМГААЛАЛТЫН ТӨСЛИЙН ТЭЗҮ-ИЙГ БОЛОВСРУУЛАХ АЖИЛ 90 ХУВЬТАЙ ХЭРЭГЖИЖ БАЙНА WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24     COP17 БАГА ХУРЛЫН БЭЛТГЭЛ ХАНГАХ ХҮРЭЭНД ТЕНДЕРГҮЙ, ШУУД ХУДАЛДАН АВАЛТ ХИЙХ ЭРХИЙГ ӨГЧЭЭ WWW.ITOIM.MN НИЙТЭЛСЭН:2026/02/24     "ЭРДЭНЭБҮРЭНГИЙН УСАН ЦАХИЛГААН СТАНЦЫН АЖЛЫН ЯВЦ 20 ХУВЬТАЙ БАЙНА" WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/24     ТӨМӨР ЗАМЫН ТЕРМИНАЛЫН ДЭД БҮТЦИЙГ САНХҮҮЖҮҮЛЭХ САНАЛ ТАВЬЖЭЭ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/24     НИЙСЛЭЛД ЖИЛДЭЭ 44.420 ТОНН ХУВАНЦАРЫГ ДАХИН БОЛОВСРУУЛНА WWW.EGUUR.MN НИЙТЭЛСЭН:2026/02/24     МОНГОЛ УЛС, БНСУ-ЫН ГХЯ ХООРОНДЫН СТРАТЕГИЙН УУЛЗАЛТ БОЛОВ WWW.MONTSAME.MN НИЙТЭЛСЭН:2026/02/24     ДҮҮЖИН ЗАМЫН ТЭЭВЭР ТӨСЛИЙН ЯВЦ 60.5 ХУВЬТАЙ БАЙНА WWW.NEWS.MN НИЙТЭЛСЭН:2026/02/24    
Англи амин дэм Монгол улсад албан ёсоор бүртгэгдлээ.

CDW Recycling Plant at Moringiin Davaa to Recycle 100 Tons of Waste Daily www.montsame.mn

The Construction and Demolition Waste Recycling Plant at the Moringiin Davaa Dump Site, located in Khan-Uul district of Ulaanbaatar City, is capable of recycling up to 100 tons of waste daily. 
The Plant has procured 29 types of machinery and equipment that are indispensable to the operation, including a landfill compactor, demolition excavator, bulldozer, wheel loader, water truck, and dump truck. The eco-friendly waste landfill facility meets hygiene requirements and has a capacity of receiving 8.5 tons of waste. 
The Plant was constructed by the order of the Governor’s Office of the Capital City as part of the “Ulaanbaatar Solid Waste Modernization” Project with financing from the European Bank for Reconstruction and Development (EBRD) and a grant aid from the European Union. It has a new landfill facility that meets hygiene requirements, a construction waste crushing and sorting facility, a garage for machinery and equipment, and an office building. 
Ulaanbaatar’s three centralized landfills collect an average of 1.4 million tons of waste annually, of which 11.4 percent is recycled, and 88.6 percent is buried. Construction waste accounts for 20-30 percent of the total waste collected.
During his visit to the Plant, General Manager of Ulaanbaatar City and Head of the Ulaanbaatar City Council G. Batzorig highlighted, “The Project is important for processing solid waste into gravel and crushed stone, putting them into an economic circulation, reducing the number of landfill sites and CO2 emissions, conserving water and energy, and creating sustainable jobs.”

 



Published Date:2025-02-27